Drill Stem Tests Database
Specific Well--15-119-20990
API: 15-119-20990
Operator: McCoy Petroleum Corp.
Field: Mohler
Lease: Hissom 'A'
Well 1-3
Location: T34S R29W, Sec. 3, NE NE SE
2295 North, 348 West, from SE corner
Longitude: -100.453727
Latitude: 37.1179105
County: Meade
Status: D&A
Spud Date: 31-DEC-97
Completion Date: 11-JAN-98
Plugging Date: 11-JAN-98
Total Depth: 5430
Form. at depth: MARMATON GROUP
Elevation: 2505 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 3204 to 3222
Formation tested: Council Grove
Date, Time: 05-JAN-98; 02:01:13
Initial Hydro Pressure: 1520 PSI
First Initial Flow Pressure: 171 PSI
First Final Flow Pressure: 196 PSI
Initial Shut-in Pressure: 915 PSI
Second Initial Flow Pressure: 198 PSI
Second Final Flow Pressure: 223 PSI
Final Shut-in Pressure: 888 PSI
Final Hydro Pressure: 1505 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.6 in.
Drill Collar Length: 188 ft.
Drill Pipe Length: 2991 ft.
INITIAL FLOW: SLID TOOL 12' IN 1 MIN. SLID 6' MORE IN 16 MIN. STRONG OBB IMMED. DECREASED SLIGHTLY IN 30 MIN. INITIAL SHUT-IN: NO BLOWBACK FINAL FLOW: NO BLOW, BUILT TO 4"" IN BUCKET 30 MIN. FINAL SHUT-IN: NO BLOWBACK
Bottom Hole Temperature: 92 DEG F
Percent Porosity: 12
Samples: NONE
Gas Recovery:
Comments:
Recovery
405 of Total Fluid
188 of Fluid in Drill Collars
217 of Fluid in Drill Pipe
225 of Water cut mud 43%WTR 57%MUD
180 of Slightly mud cut water 85%WTR 15%MUD
52000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5265 to 5285
Formation tested: Marmaton
Date, Time: 08-JAN-98; 12:51:26
Initial Hydro Pressure: 2524 PSI
First Initial Flow Pressure: 42 PSI
First Final Flow Pressure: 72 PSI
Initial Shut-in Pressure: 1204 PSI
Second Initial Flow Pressure: 61 PSI
Second Final Flow Pressure: 114 PSI
Final Shut-in Pressure: 1162 PSI
Final Hydro Pressure: 2470 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.6 in.
Drill Collar Length: 188 ft.
Drill Pipe Length: 5066 ft.
3"" to strong OBB in 1 min. I.F.P. No blow-back I.S.I.P. Strong OBB Immed. & throughout F.F.P. Surface blow-back F.S.I.P.
Bottom Hole Temperature: 122 DEG F
Percent Porosity: 17
Samples: None
Gas Recovery:
Comments:
Recovery
250 of Total Fluid
188 of Fluid in Drill Collars
62 of Fluid in Drill Pipe
3620 of GIP
200 of Mud cut Gassy Oil 25%G 40%O 12%W 23%M
50 of Mud & Oil cut Gassy Wtr 3%G 3%O 80%W 14%M
128000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.