API: 15-119-20990
Operator: McCoy Petroleum Corp. Field: Mohler Lease: Hissom 'A' Well 1-3 |
Location: T34S R29W, Sec. 3, NE NE SE
2295 North, 348 West, from SE corner Longitude: -100.453727 Latitude: 37.1179105 County: Meade Status: D&A |
Spud Date: 31-DEC-97
Completion Date: 11-JAN-98 Plugging Date: 11-JAN-98 Total Depth: 5430 Form. at depth: MARMATON GROUP Elevation: 2505 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 3204 to 3222
Formation tested: Council Grove | Date, Time: 05-JAN-98; 02:01:13 |
Initial Hydro Pressure: 1520 PSI
First Initial Flow Pressure: 171 PSI First Final Flow Pressure: 196 PSI Initial Shut-in Pressure: 915 PSI Second Initial Flow Pressure: 198 PSI Second Final Flow Pressure: 223 PSI Final Shut-in Pressure: 888 PSI Final Hydro Pressure: 1505 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.6 in. Drill Collar Length: 188 ft. Drill Pipe Length: 2991 ft. |
INITIAL FLOW: SLID TOOL 12' IN 1 MIN. SLID 6' MORE IN 16 MIN. STRONG OBB IMMED. DECREASED SLIGHTLY IN 30 MIN. INITIAL SHUT-IN: NO BLOWBACK FINAL FLOW: NO BLOW, BUILT TO 4"" IN BUCKET 30 MIN. FINAL SHUT-IN: NO BLOWBACK | |
Bottom Hole Temperature: 92 DEG F
Percent Porosity: 12 Samples: NONE Gas Recovery: Comments: | |
Recovery 405 of Total Fluid 188 of Fluid in Drill Collars 217 of Fluid in Drill Pipe 225 of Water cut mud 43%WTR 57%MUD 180 of Slightly mud cut water 85%WTR 15%MUD 52000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5265 to 5285
Formation tested: Marmaton | Date, Time: 08-JAN-98; 12:51:26 |
Initial Hydro Pressure: 2524 PSI
First Initial Flow Pressure: 42 PSI First Final Flow Pressure: 72 PSI Initial Shut-in Pressure: 1204 PSI Second Initial Flow Pressure: 61 PSI Second Final Flow Pressure: 114 PSI Final Shut-in Pressure: 1162 PSI Final Hydro Pressure: 2470 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.6 in. Drill Collar Length: 188 ft. Drill Pipe Length: 5066 ft. |
3"" to strong OBB in 1 min. I.F.P. No blow-back I.S.I.P. Strong OBB Immed. & throughout F.F.P. Surface blow-back F.S.I.P. | |
Bottom Hole Temperature: 122 DEG F
Percent Porosity: 17 Samples: None Gas Recovery: Comments: | |
Recovery 250 of Total Fluid 188 of Fluid in Drill Collars 62 of Fluid in Drill Pipe 3620 of GIP 200 of Mud cut Gassy Oil 25%G 40%O 12%W 23%M 50 of Mud & Oil cut Gassy Wtr 3%G 3%O 80%W 14%M 128000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |