Drill Stem Tests Database
Specific Well--15-129-21496
API: 15-129-21496
Operator: Oxy USA, Inc.
Field: Kinsler
Lease: DREW 'A'
Well 5
Location: T32S R40W, Sec. 1, SW NE NW
4290 North, 3630 West, from SE corner
Longitude: -101.6223394
Latitude: 37.2985888
County: Morton
Status: GAS
Spud Date: 12-APR-97
Completion Date: 11-JUL-97
Plugging Date:
Total Depth: 6000
Form. at depth: KEARNY FORMATION
Elevation: 3279 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 5326 to 5445
Formation tested: Morrow
Date, Time: 20-APR-97; 10:53:01
Initial Hydro Pressure: 2493 PSI
First Initial Flow Pressure: 29 PSI
First Final Flow Pressure: 34 PSI
Initial Shut-in Pressure: 996 PSI
Second Initial Flow Pressure: 29 PSI
Second Final Flow Pressure: 29 PSI
Final Shut-in Pressure: 1213 PSI
Final Hydro Pressure: 2329 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 544 ft.
Drill Pipe Length: 4762 ft.
Initial Flow: Fair blow, built to bottom of bucket in 8 minutes Initial Shut In:
Final Flow: Strong blow, bottom of bucket soon as tool opened
Final Shut In: Bled off 2"", had 1/2"" blow back
Bottom Hole Temperature: 124 DEG F
Percent Porosity:
Samples: NO
Gas Recovery:
Comments:
Recovery
10 of Total Fluid
10 of Fluid in Drill Collars
10 of 100% Mud
445 of Gas in Pipe
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4990 to 5057
Formation tested: Cherokee
Date, Time: 23-APR-97; 11:37:35
Initial Hydro Pressure: 2479 PSI
First Initial Flow Pressure: 85 PSI
First Final Flow Pressure: 170 PSI
Initial Shut-in Pressure: 1407 PSI
Second Initial Flow Pressure: 109 PSI
Second Final Flow Pressure: 282 PSI
Final Shut-in Pressure: 1404 PSI
Final Hydro Pressure: 2400 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 634 ft.
Drill Pipe Length: 5323 ft.
Initial Flow: Strong blow - bottom of bucket in 1 minute Gas to surface in 18 minutes MCF @ 39002
Final Flow: Strong blow - bottom of bucket soon as opened tool MCF @ 89.7
Bottom Hole Temperature: 130 DEG F
Percent Porosity:
Samples: Yes 1
Gas Recovery:
Comments:
Recovery
200 of Total Fluid
200 of Fluid in Drill Collars
200 of 100% Drlg Mud
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.