Drill Stem Tests Database
Specific Well--15-129-21517
API: 15-129-21517
Operator: Anadarko Petroleum Corp.
Field: Richfield
Lease: GOING 'A'
Well 7
Location: T32S R41W, Sec. 26, NW NE
660 South, 1980 West, from NE corner
Longitude: -101.7435469
Latitude: 37.2414779
County: Morton
Status: GAS
Spud Date: 19-JUN-97
Completion Date: 11-AUG-97
Plugging Date:
Total Depth: 5897
Form. at depth: OSAGE STAGE
Elevation: 3420 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 5044 to 5220
Formation tested: Lower Morrow & Keys
Date, Time: 27-JUN-97; 10:23:37
Initial Hydro Pressure: PSI
First Initial Flow Pressure: PSI
First Final Flow Pressure: PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 710 ft.
Drill Pipe Length: 4445 ft.
Initial Flow: No blow, 10 mins in to open flushed tool, no blow Initial Shut In: Went to close tool, could not torque Tripped out of hole MISRUN
Bottom Hole Temperature: 120 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.