|
API: 15-129-21522
Operator: Anadarko Petroleum Corp. Field: Taloga Lease: Bennett 'B' Well 6 |
Location: T34S R42W, Sec. 36, SW SE
660 North, 1980 West, from SE corner Longitude: -101.8333592 Latitude: 37.0414278 County: Morton Status: D&A |
Spud Date: 17-JUL-97
Completion Date: 27-JUL-97 Plugging Date: 27-JUL-97 Total Depth: 5300 Form. at depth: MISSISSIPPIAN Elevation: 3538 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4638 to 4751
Formation tested: Upper Morrow | Date, Time: 23-JUL-97; 08:59:54 |
|
Initial Hydro Pressure: 2366 PSI
First Initial Flow Pressure: 31 PSI First Final Flow Pressure: 39 PSI Initial Shut-in Pressure: 70 PSI Second Initial Flow Pressure: 37 PSI Second Final Flow Pressure: 43 PSI Final Shut-in Pressure: 69 PSI Final Hydro Pressure: 2205 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 724 ft. Drill Pipe Length: 3999 ft. |
|
Initial Flow: Weak surface blow, bilut to 1"" Final Flow: NO blow |
|
|
Bottom Hole Temperature: 117 DEG F
Percent Porosity: Samples: NO Gas Recovery: Comments: | |
|
Recovery 30 of Total Fluid 30 of Fluid in Drill Collars 30 of Drilling Mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 4635 to 4803
Formation tested: Upper Morrow | Date, Time: 24-JUL-97; 07:41:54 |
|
Initial Hydro Pressure: 2515 PSI
First Initial Flow Pressure: 156 PSI First Final Flow Pressure: 701 PSI Initial Shut-in Pressure: 1339 PSI Second Initial Flow Pressure: 761 PSI Second Final Flow Pressure: 1087 PSI Final Shut-in Pressure: 1330 PSI Final Hydro Pressure: 2391 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 724 ft. Drill Pipe Length: 4061 ft. |
|
Initial Flow: Strong blow, bottom of bucket in 2 min Initial Shut In: Bled off 2"", with surface blow back Final Flow: Strong blow, bottom of bucket in 5 min Final Shut In: Bled off 2"", with surface blow back |
|
|
Bottom Hole Temperature: 118 DEG F
Percent Porosity: Samples: NO Gas Recovery: Comments: | |
|
Recovery 2250 of Total Fluid 724 of Fluid in Drill Collars 1526 of Fluid in Drill Pipe 150 of Drilling Mud 180 of Muddy Water 300 of Muddy Water 1620 of Salt Water 54000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |