API: 15-129-21530
Operator: Anadarko Petroleum Corp. Field: Cimarron Valley Lease: USA EVANS 'D' Well 1 |
Location: T33S R40W, Sec. 4, W2 NW
1320 South, 660 East, from NW corner Longitude: -101.6800389 Latitude: 37.2107409 County: Morton Status: GAS |
Spud Date: 11-SEP-97
Completion Date: 12-NOV-97 Plugging Date: Total Depth: 7010 Form. at depth: ARBUCKLE GROUP Elevation: 3356 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 5385 to 5493
Formation tested: Lower Morrow | Date, Time: 20-SEP-97; 11:59:40 |
Initial Hydro Pressure: 2696 PSI
First Initial Flow Pressure: 425 PSI First Final Flow Pressure: 962 PSI Initial Shut-in Pressure: 894 PSI Second Initial Flow Pressure: 350 PSI Second Final Flow Pressure: 710 PSI Final Shut-in Pressure: 813 PSI Final Hydro Pressure: 2541 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 688 ft. Drill Pipe Length: 4777 ft. |
Initial Flow: Weak blow, built to 1/2"" in bucket then decreasing and died Initial Shut In: Final Flow: Weak blow for 2 minutes then died Final Shut In: MISRUN |
|
Bottom Hole Temperature: 140 DEG F
Percent Porosity: 34 Samples: None Gas Recovery: Comments: | |
Recovery 5 of Total Fluid 5 of Fluid in Drill Collars 5 of Drilling Mud. | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5516 to 5530
Formation tested: Lower Morrow ""G""Ma. | Date, Time: 22-SEP-97; 16:15:30 |
Initial Hydro Pressure: 2721 PSI
First Initial Flow Pressure: 685 PSI First Final Flow Pressure: 674 PSI Initial Shut-in Pressure: 1281 PSI Second Initial Flow Pressure: 637 PSI Second Final Flow Pressure: 747 PSI Final Shut-in Pressure: 1280 PSI Final Hydro Pressure: 2600 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.68 in. Drill Collar Length: 688 ft. Drill Pipe Length: 4808 ft. |
Initial Flow: Strong blow, bottom if bucket in 1 min Gas to surface in 4 mins Initial Shut In: Weak blow back, 1"" in bucket after 15 min bleed off Final Flow: Strong blow, bottom of bucket soon as tool opened, Mud to surface in 50 min Strong Spray Final Shut In: No blow back |
|
Bottom Hole Temperature: 141 DEG F
Percent Porosity: Samples: Yes,bottled gas chamber. Gas Recovery: Comments: | |
Recovery 1133 of Total Fluid 688 of Fluid in Drill Collars 445 of Fluid in Drill Pipe 53 of Gassy Mud Cut Water 240 of Gassy Mud Cut Water 240 of Gassy Slightly Mud Cut Water 600 of Water 100% 29000 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |