Drill Stem Tests Database
Specific Well--15-135-23949
API: 15-135-23949
Operator: Plainsco, LTD.
Field: Center Hill
Lease: Thompson
Well 12-14
Location: T17S R22W, Sec. 12, SE SW
660 North, 1980 East, from SW corner
Longitude: -99.7090156
Latitude: 38.5837979
County: Ness
Status: D&A
Spud Date: 01-OCT-96
Completion Date: 10-OCT-96
Plugging Date: 08-MAY-97
Total Depth: 4410
Form. at depth: MISSISSIPPIAN
Elevation: 2328 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4235 to 4257
Formation tested: Cherokee ""A"" Sand
Date, Time: 07-OCT-96; 05:36:13
Initial Hydro Pressure: 2110 PSI
First Initial Flow Pressure: 21 PSI
First Final Flow Pressure: 34 PSI
Initial Shut-in Pressure: 497 PSI
Second Initial Flow Pressure: 22 PSI
Second Final Flow Pressure: 38 PSI
Final Shut-in Pressure: 500 PSI
Final Hydro Pressure: 2106 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 30 ft.
Drill Pipe Length: 4210 ft.
Initial Flow - 1/2"" blow building to 3""
Final Flow - 1/2"" blow building to 7 1/2""
Bottom Hole Temperature: 118 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
65 of Total Fluid
30 of Fluid in Drill Collars
35 of Fluid in Drill Pipe
200 of gas in pipe
5 of clean gassy oil 5% gas 95% oil
60 of mud cut oil 50% oil 50% mud
4500 of Salinity (PPM)
42 of Gravity (API)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4269 to 4326
Formation tested: Mississippi
Date, Time: 08-OCT-96; 23:23:49
Initial Hydro Pressure: 2165 PSI
First Initial Flow Pressure: 27 PSI
First Final Flow Pressure: 31 PSI
Initial Shut-in Pressure: 191 PSI
Second Initial Flow Pressure: 31 PSI
Second Final Flow Pressure: 33 PSI
Final Shut-in Pressure: 96 PSI
Final Hydro Pressure: 2109 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 30 ft.
Drill Pipe Length: 4241 ft.
Initial Flow - Weak 1/2"" Blow
Final Flow - no blow
Bottom Hole Temperature: 110 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
5 of Total Fluid
5 of Fluid in Drill Collars
5 of mud with oil specks
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.