Drill Stem Tests Database
Specific Well--15-135-23952
API: 15-135-23952
Operator: CASTELLI EXPLORATION, INC.
Field: L.T.P. North
Lease: JONES
Well 2
Location: T18S R24W, Sec. 16, SW SW SE
400 North, 2240 West, from SE corner
Longitude: -99.9801895
Latitude: 38.4800375
County: Ness
Status: OIL
Spud Date: 09/23/1996
Completion Date: 09/30/1996
Plugging Date:
Total Depth: 4400
Form. at depth: MISSISSIPPIAN
Elevation: 2291 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 4260 to 4299
Formation tested: Cherokee Sd
Date, Time: 09/29/1996; 02:16:10
Initial Hydro Pressure: 2131 PSI
First Initial Flow Pressure: 40 PSI
First Final Flow Pressure: 99 PSI
Initial Shut-in Pressure: 1248 PSI
Second Initial Flow Pressure: 103 PSI
Second Final Flow Pressure: 158 PSI
Final Shut-in Pressure: 1262 PSI
Final Hydro Pressure: 2088 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 30 ft.
Drill Pipe Length: 4212 ft.
Initial Flow - Weak, building to bottom of bucket in 20 minutes
Final Flow - Weak, building to bottom of bucket in 22 minutes
Bottom Hole Temperature: 120 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
355 of Total Fluid
30 of Fluid in Drill Collars
325 of Fluid in Drill Pipe
496 of Gas in pipe
169 of Clean gassy oil - 10% gas, 90% oil
186 of Mud cut gassy oil - 10% gas, 80% oil, 10% mud
36 of Gravity (API)
View Pressures No Recovery Gas data.