API: 15-135-23965
Operator: American Warrior Inc. Field: Aldrich Lease: Bateman Well 5 |
Location: T18S R26W, Sec. 24, NE NW SW
2310 North, 4290 West, from SE corner Longitude: -100.1511729 Latitude: 38.4713703 County: Ness Status: OIL |
Spud Date: 12-NOV-96
Completion Date: 21-NOV-96 Plugging Date: Total Depth: 4440 Form. at depth: MISSISSIPPIAN Elevation: 2534 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4200 to 4268
Formation tested: Mrmaton | Date, Time: 19-NOV-96; 07:27:44 |
Initial Hydro Pressure: 2076 PSI
First Initial Flow Pressure: 58 PSI First Final Flow Pressure: 340 PSI Initial Shut-in Pressure: 780 PSI Second Initial Flow Pressure: 352 PSI Second Final Flow Pressure: 608 PSI Final Shut-in Pressure: 776 PSI Final Hydro Pressure: 2027 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 30 ft. Drill Pipe Length: 4148 ft. |
Initial Flow - Bottom of bucket in 4-1/2 min. Initial Shut-in - Bleed off blow - weak surface return in 6 min. - died in 9 min. Final Flow - Bottom of bucket in 7 min. Final Shut-in - No return |
|
Bottom Hole Temperature: 135 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 1260 of Total Fluid 30 of Fluid in Drill Collars 1230 of Fluid in Drill Pipe 60 of mud cut water 60%water 40%mud 120 of muddy water 75%water 25% mud 1080 of salt water trace mud 100% water 38000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 4401 to 4431
Formation tested: Cherokee | Date, Time: 20-NOV-96; 10:14:06 |
Initial Hydro Pressure: 2156 PSI
First Initial Flow Pressure: 14 PSI First Final Flow Pressure: 14 PSI Initial Shut-in Pressure: 22 PSI Second Initial Flow Pressure: 14 PSI Second Final Flow Pressure: 16 PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 2136 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 30 ft. Drill Pipe Length: 4362 ft. |
Initial Flow -face blow 1/4""in. Weak surface blow 1/4"" Died in 21 min. Initial Shut-in - No Return Final Flow - No blow - flush tool - good surge No blow - pull tool |
|
Bottom Hole Temperature: 118 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 5 of Total Fluid 5 of Fluid in Drill Collars 5 of drilling mud 100% mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |