API: 15-135-23983
Operator: AMERICAN WARRIOR, INC. Field: Ransom South Lease: HORCHEM Well 2 |
Location: T16S R24W, Sec. 34, S2 S2 SE
330 North, 1320 West, from SE corner Longitude: -99.9598354 Latitude: 38.6102332 County: Ness Status: OIL-P&A |
Spud Date: 21-MAR-97
Completion Date: 30-MAY-97 Plugging Date: 17-JAN-12 Total Depth: 4575 Form. at depth: MISSISSIPPIAN Elevation: 2526 KB |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 4449 to 4492
Formation tested: Cherokee | Date, Time: 28-MAR-97; 00:02:57 |
Initial Hydro Pressure: 2188 PSI
First Initial Flow Pressure: 22 PSI First Final Flow Pressure: 23 PSI Initial Shut-in Pressure: 232 PSI Second Initial Flow Pressure: 23 PSI Second Final Flow Pressure: 24 PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 2151 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: in. Drill Collar Length: ft. Drill Pipe Length: 4437 ft. |
Initial Flow- Weak 1/8"" blow decreasing to surface blow at end. Final Flow- |
|
Bottom Hole Temperature: 109 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 2 of Total Fluid 2 of Fluid in Drill Pipe 2 of Mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 4452 to 4502
Formation tested: Cherokee | Date, Time: 28-MAR-97; 12:36:25 |
Initial Hydro Pressure: 2204 PSI
First Initial Flow Pressure: 22 PSI First Final Flow Pressure: 37 PSI Initial Shut-in Pressure: 1166 PSI Second Initial Flow Pressure: 37 PSI Second Final Flow Pressure: 51 PSI Final Shut-in Pressure: 1125 PSI Final Hydro Pressure: 2160 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: in. Drill Collar Length: ft. Drill Pipe Length: 4437 ft. |
Initial Flow- 1/2"" blow building to 4 1/2"" Final Flow- 1/8"" blow building to 3 1/2"" |
|
Bottom Hole Temperature: 109 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 80 of Total Fluid 80 of Fluid in Drill Pipe 60 of Gas In Pipe 40 of Clean Oil 40 of Slight Oil Cut Mud 10% oil 90% mud 34 of Gravity (API) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |