API: 15-135-24044
Operator: John O. Farmer, Inc. Field: Rap Northeast Lease: Potter 'B' Well 2 |
Location: T17S R25W, Sec. 1, NE SW
1980 North, 1980 East, from SW corner Longitude: -100.0404754 Latitude: 38.6004035 County: Ness Status: D&A |
Spud Date: 05-DEC-97
Completion Date: 13-DEC-97 Plugging Date: 13-DEC-97 Total Depth: 4490 Form. at depth: MISSISSIPPIAN Elevation: 2447 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4315 to 4353
Formation tested: Fort Scott | Date, Time: 11-DEC-97; 19:49:34 |
Initial Hydro Pressure: 2130 PSI
First Initial Flow Pressure: 24 PSI First Final Flow Pressure: 45 PSI Initial Shut-in Pressure: 1048 PSI Second Initial Flow Pressure: 46 PSI Second Final Flow Pressure: 51 PSI Final Shut-in Pressure: 791 PSI Final Hydro Pressure: 2121 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.5 in. Drill Collar Length: 30 ft. Drill Pipe Length: 4286 ft. |
I.O.- 1/8""in. blow died back to a weak I.S.I.- No return F.F.- Weak surface blow built to 1/8""in. F.S.I.- No return | |
Bottom Hole Temperature: 114 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 60 of Total Fluid 30 of Fluid in Drill Collars 30 of Fluid in Drill Pipe 60 of heavy drilling mud spec's of oil 100% mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 4395 to 4442
Formation tested: Mississippi | Date, Time: 12-DEC-97; 04:17:21 |
Initial Hydro Pressure: 2151 PSI
First Initial Flow Pressure: 27 PSI First Final Flow Pressure: 36 PSI Initial Shut-in Pressure: 717 PSI Second Initial Flow Pressure: 38 PSI Second Final Flow Pressure: 40 PSI Final Shut-in Pressure: 637 PSI Final Hydro Pressure: 2125 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 30 ft. Drill Pipe Length: 4351 ft. |
Initial Flow: Surface blow died in 9 minutes. Initial Shutin: No return. Final Flow: No blow. Final Shutin: No return. |
|
Bottom Hole Temperature: 104 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 10 of Total Fluid 10 of Fluid in Drill Collars 10 of drilg mud heavy oil scum 100% mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |