|
API: 15-145-21441
Operator: CROSS BAR PET Field: Ryan E Lease: M. GROSS Well 1-1 |
Location: T20S R16W, Sec. 1, NW NW NE
330 South, 2310 West, from NE corner Longitude: -99.0400217 Latitude: 38.3474256 County: Pawnee Status: D&A |
Spud Date: 10/18/1996
Completion Date: 10/25/1996 Plugging Date: 10/25/1996 Total Depth: 3800 Form. at depth: ARBUCKLE GROUP Elevation: 1983 KB |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 3730 to 3744
Formation tested: Arbuckle | Date, Time: 10/25/1996; 22:45:53 |
|
Initial Hydro Pressure: 1844 PSI
First Initial Flow Pressure: 56 PSI First Final Flow Pressure: 89 PSI Initial Shut-in Pressure: 1068 PSI Second Initial Flow Pressure: 94 PSI Second Final Flow Pressure: 139 PSI Final Shut-in Pressure: 1066 PSI Final Hydro Pressure: 1827 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3710 ft. |
|
Initial Flow - Fair to strong blow - bottom of bucket in 5 min. Final Flow - Fair to strong blow - bottom of bucket in 15 min. |
|
|
Bottom Hole Temperature: 121 DEG F
Percent Porosity: 12 Samples: none Gas Recovery: Comments: | |
|
Recovery 285 of Total Fluid 285 of Fluid in Drill Pipe 435 of Gas in pipe 1 of Clean Oil 29 of Oil Cut Watery Mud 18%Oil 18%Water 64%Mud 120 of Slightly Oil Cut Muddy Water 2%O 88%W 10%M 125 of Salt Water with a few specs. 40000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 3708 to 3720
Formation tested: Arbuckle | Date, Time: 10/24/1996; 08:17:23 |
|
Initial Hydro Pressure: 1853 PSI
First Initial Flow Pressure: 116 PSI First Final Flow Pressure: 422 PSI Initial Shut-in Pressure: 1053 PSI Second Initial Flow Pressure: 436 PSI Second Final Flow Pressure: 628 PSI Final Shut-in Pressure: 1054 PSI Final Hydro Pressure: 1799 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3708 ft. |
|
Initial flow _ Strong blow - bottom of bucket in 5 secs. Gas to surface in 12 minutes (see gas volume report) Final Flow - Strong blow - bottom of bucket in 5 mins.) (seee gas volume report) |
|
|
Bottom Hole Temperature: 122 DEG F
Percent Porosity: 12 Samples: 1 gas bottle Gas Recovery: Comments: | |
|
Recovery 1450 of Total Fluid 1450 of Fluid in Drill Pipe 5 of Clean Oil 130 of Heavy oil & gas cut mud 120 of Oil cut muddy water 1195 of Salt water with a few oil specs 37000 of Salinity (PPM) | |
| View Pressures | View Recovery Gas |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 3608 to 3690
Formation tested: Arbuckle | Date, Time: 10/23/1996; 17:12:57 |
|
Initial Hydro Pressure: 1824 PSI
First Initial Flow Pressure: 281 PSI First Final Flow Pressure: 384 PSI Initial Shut-in Pressure: 688 PSI Second Initial Flow Pressure: 387 PSI Second Final Flow Pressure: 412 PSI Final Shut-in Pressure: 703 PSI Final Hydro Pressure: 1759 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3588 ft. |
|
Initial Flow - Strong blow - bottom of bucket in 15 seconds - decreasing to 5"" blow after 45 minutes Final Flow - Weak to fair blow (1-5"") |
|
|
Bottom Hole Temperature: 116 DEG F
Percent Porosity: 12 Samples: none Gas Recovery: Comments: | |
|
Recovery 970 of Total Fluid 970 of Fluid in Drill Pipe 200 of Watery mud with oil specs 770 of Slightly gas cut muddy water 24000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |