Drill Stem Tests Database
Specific Well--15-151-22142
API: 15-151-22142
Operator: Kenneth S. White
Field: Rell East
Lease: Bass
Well 1
Location: T29S R14W, Sec. 11, SE NE SW
1650 North, 2310 East, from SW corner
Longitude: -98.8218468
Latitude: 37.5332672
County: Pratt
Status: D&A
Spud Date: 04-MAR-96
Completion Date: 12-MAR-96
Plugging Date: 12-MAR-96
Total Depth: 4705
Form. at depth: ARBUCKLE GROUP
Elevation: 1998 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 4550 to 4570
Formation tested: Simpson
Date, Time: 10-MAR-96; 23:40:28
Initial Hydro Pressure: 2252 PSI
First Initial Flow Pressure: 25 PSI
First Final Flow Pressure: 26 PSI
Initial Shut-in Pressure: 32 PSI
Second Initial Flow Pressure: 20 PSI
Second Final Flow Pressure: 30 PSI
Final Shut-in Pressure: 51 PSI
Final Hydro Pressure: 2247 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 240 ft.
Drill Pipe Length: 4299 ft.
Initial Flow - Weak blow, .5""
Final Flow - No blow, flushed tool 22 min into final flow
Bottom Hole Temperature: 119 DEG F
Percent Porosity: 9
Samples:
Gas Recovery:
Comments:
Recovery
20 of Total Fluid
20 of Fluid in Drill Collars
20 of Mud w/ good oil scum at top of tool
4 of Pay (est)
4000 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4558 to 4574
Formation tested: Simpson
Date, Time: 10-MAR-96; 12:47:29
Initial Hydro Pressure: 2275 PSI
First Initial Flow Pressure: 27 PSI
First Final Flow Pressure: 31 PSI
Initial Shut-in Pressure: 979 PSI
Second Initial Flow Pressure: 33 PSI
Second Final Flow Pressure: 35 PSI
Final Shut-in Pressure: 830 PSI
Final Hydro Pressure: 2258 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 240 ft.
Drill Pipe Length: 4330 ft.
Initial Flow - Very weak surface blow
Final Flow - No blow
Bottom Hole Temperature: 111 DEG F
Percent Porosity: 10
Samples:
Gas Recovery:
Comments:
Recovery
5 of Total Fluid
5 of Fluid in Drill Collars
5 of Mud w/ a few oil specks
6 of Pay (est)
6000 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 4558 to 4579
Formation tested: Simpson
Date, Time: 11-MAR-96; 23:52:40
Initial Hydro Pressure: 2336 PSI
First Initial Flow Pressure: 23 PSI
First Final Flow Pressure: 33 PSI
Initial Shut-in Pressure: 1057 PSI
Second Initial Flow Pressure: 37 PSI
Second Final Flow Pressure: 50 PSI
Final Shut-in Pressure: 940 PSI
Final Hydro Pressure: 2265 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 240 ft.
Drill Pipe Length: 4330 ft.
Initial Flow - Weak blow, .25"" - .5""
Final Flow - Weak blow, .25"" decreasing, dead in 43 min
Bottom Hole Temperature: 118 DEG F
Percent Porosity: 10
Samples:
Gas Recovery:
Comments:
Recovery
5 of Total Fluid
5 of Fluid in Drill Collars
5 of Drilling mud w/ a few oil specks
6 of Pay (est)
10000 of Salinity (PPM)
View Pressures No Recovery Gas data.