Drill Stem Tests Database
Specific Well--15-151-22145
API: 15-151-22145
Operator: Rheem Resources, Inc.
Field: Iuka-Carmi
Lease: Hoeme
Well 2
Location: T27S R12W, Sec. 17, SE NE NE
4290 North, 330 West, from SE corner
Longitude: -98.6467325
Latitude: 37.7009585
County: Pratt
Status: OIL
Spud Date: 19-AUG-96
Completion Date: 28-AUG-96
Plugging Date:
Total Depth: 4400
Form. at depth: SIMPSON GROUP LOWER
Elevation: 1862 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4110 to 4170
Formation tested: MISS
Date, Time: 26-AUG-96; 22:53:23
Initial Hydro Pressure: 1983 PSI
First Initial Flow Pressure: 26 PSI
First Final Flow Pressure: 44 PSI
Initial Shut-in Pressure: 1081 PSI
Second Initial Flow Pressure: 62 PSI
Second Final Flow Pressure: 77 PSI
Final Shut-in Pressure: 1246 PSI
Final Hydro Pressure: 1958 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4095 ft.
Initial Flow - Strong - bottom of bucket in 90 sec
Initial Shutin - Strong - bottom of bucket in 5 min
Final Flow - Strong - bottom of bucket when tool opened; Gas to surface in 3 min - too small to measure
Final Shutin - Surface blow, building to 2""
Bottom Hole Temperature: 127 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
150 of Total Fluid
150 of Fluid in Drill Pipe
3960 of Gas in pipe
90 of Slightly gassy oil cut mud -
60 of Gassy oil cut mud - 50% gas, 10% oil, 40% mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4170 to 4190
Formation tested: MISS
Date, Time: 26-AUG-96; 14:13:44
Initial Hydro Pressure: 2080 PSI
First Initial Flow Pressure: 15 PSI
First Final Flow Pressure: 22 PSI
Initial Shut-in Pressure: 881 PSI
Second Initial Flow Pressure: 22 PSI
Second Final Flow Pressure: 33 PSI
Final Shut-in Pressure: 1219 PSI
Final Hydro Pressure: 2007 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4155 ft.
Initial Flow - Strong - bottom of bucket in 11 min
Initial Shutin - 1"" - 5"" blow
Final Flow - Strong - bottom of bucket in 2 sec
Final Shutin - Surface blow
Bottom Hole Temperature: 125 DEG F
Percent Porosity: 10
Samples:
Gas Recovery:
Comments:
Recovery
45 of Total Fluid
45 of Fluid in Drill Pipe
2800 of Gas in pipe
25 of Clean Oil - 100% oil
20 of Gassy oil cut mud - 15% gas, 20% oil, 65% mud
20 of Pay (est)
7500 of Salinity (PPM)
38 of Gravity (API)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.