API: 15-155-21386
Operator: Halliburton Oil Producers Field: Albion South Lease: Preheim Well 1-22 |
Location: T26S R6W, Sec. 22, SW SW SE
330 North, 2310 West, from SE corner Longitude: -97.9623802 Latitude: 37.7637181 County: Reno Status: O&G-P&A |
Spud Date: 30-APR-96
Completion Date: 19-JUL-96 Plugging Date: 19-NOV-97 Total Depth: 4170 Form. at depth: SIMPSON GROUP LOWER Elevation: 1560 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 3700 to 3720
Formation tested: MISS. | Date, Time: 05-MAY-96; 04:38:07 |
Initial Hydro Pressure: 1822 PSI
First Initial Flow Pressure: 34 PSI First Final Flow Pressure: 58 PSI Initial Shut-in Pressure: 1098 PSI Second Initial Flow Pressure: 64 PSI Second Final Flow Pressure: 124 PSI Final Shut-in Pressure: 1153 PSI Final Hydro Pressure: 1784 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3681 ft. |
Initial Flow - Strong blow, gas to surface in 16 min Final Flow - Strong blow |
|
Bottom Hole Temperature: 121 DEG F
Percent Porosity: 10 Samples: GAS SAMPLE Gas Recovery: Comments: | |
Recovery 250 of Total Fluid 250 of Fluid in Drill Pipe 70 of Watery mud - 33% water, 67% mud 180 of Muddy water with oil specks - 12 of Pay (est) 52000 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |