API: 15-155-21392
Operator: Producers Oil Co. Field: Burrton East Lease: Van Sickle Well 7 |
Location: T23S R4W, Sec. 23, SE NW
3465 North, 3300 West, from SE corner Longitude: -97.7316323 Latitude: 38.0379523 County: Reno Status: D&A |
Spud Date: 18-JUL-96
Completion Date: 24-JUL-96 Plugging Date: 24-JUL-96 Total Depth: 3669 Form. at depth: ARBUCKLE Elevation: 1476 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 3271 to 3317
Formation tested: MISS | Date, Time: 22-JUL-96; 11:28:42 |
Initial Hydro Pressure: 1571 PSI
First Initial Flow Pressure: 58 PSI First Final Flow Pressure: 159 PSI Initial Shut-in Pressure: 578 PSI Second Initial Flow Pressure: 167 PSI Second Final Flow Pressure: 315 PSI Final Shut-in Pressure: 575 PSI Final Hydro Pressure: 1485 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3280 ft. |
Initial Flow - Strong, bottom of bucket in 10 min Final Flow - Strong, bottom of bucket in 15 min |
|
Bottom Hole Temperature: 110 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 615 of Total Fluid 615 of Fluid in Drill Pipe 135 of Gas cut watery mud w/oil spots - 240 of Gas cut muddy water - 240 of Gassy water - 10% gas, 90% water 70000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 3605 to 3619
Formation tested: HUNTON | Date, Time: 23-JUL-96; 00:20:26 |
Initial Hydro Pressure: 1773 PSI
First Initial Flow Pressure: 512 PSI First Final Flow Pressure: 1065 PSI Initial Shut-in Pressure: 1262 PSI Second Initial Flow Pressure: 1078 PSI Second Final Flow Pressure: 1262 PSI Final Shut-in Pressure: 1264 PSI Final Hydro Pressure: 1749 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3590 ft. |
Initial Flow - Strong, bottom of bucket in 2 minutes Final Flow - Strong, bottom of bucket in 1 minute |
|
Bottom Hole Temperature: 122 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 2860 of Total Fluid 2860 of Fluid in Drill Pipe 278 of Gas in pipe 45 of Gassy oil specked muddy water - 120 of Gassy oil specked muddy water - 300 of Gassy oil specked muddy water - 2395 of Oil specked gassy water - 10% g, 1% o, 89% w 48000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |