Drill Stem Tests Database
Specific Well--15-155-21399
API: 15-155-21399
Operator: HALLIBURTON OIL PRODCNG
Field: Gossage
Lease: RICHARDSON
Well 3-SWD
Location: T22S R7W, Sec. 21, NW NW NW
5055 North, 4965 West, from SE corner
Longitude: -98.104149
Latitude: 38.1293475
County: Reno
Status: SWD
Spud Date: 31-AUG-96
Completion Date: 11-SEP-96
Plugging Date:
Total Depth: 4370
Form. at depth: ARBUCKLE GROUP
Elevation: 1604 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 3458 to 3475
Formation tested: Miss
Date, Time: 03-SEP-96; 05:15:55
Initial Hydro Pressure: 1718 PSI
First Initial Flow Pressure: 16 PSI
First Final Flow Pressure: 22 PSI
Initial Shut-in Pressure: 750 PSI
Second Initial Flow Pressure: 21 PSI
Second Final Flow Pressure: 28 PSI
Final Shut-in Pressure: 472 PSI
Final Hydro Pressure: 1698 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3452 ft.
Initial Flow - 1"" blow building to bottom of bucket in 3 minutes.
Initial Shutin - Blow built to bottom of bucket in 10 minutes then decreasing to 2""
Final Flow - Strong blow, bottom of bucket when tool opened
Final Shutin - Blow built to 6""
Bottom Hole Temperature: 112 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
30 of Total Fluid
30 of Fluid in Drill Pipe
1500 of Gas in pipe
30 of Gassy mud w/ few oil specks
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.