|
API: 15-163-23294
Operator: Hinkle Oil Co. Field: Wildcat Lease: Griebel Well 1 |
Location: T6S R19W, Sec. 33, NW SE NW
1650 South, 1650 East, from NW corner Longitude: -99.4472208 Latitude: 39.4910258 County: Rooks Status: D&A |
Spud Date: 29-JAN-97
Completion Date: 03-FEB-97 Plugging Date: 03-FEB-97 Total Depth: 3600 Form. at depth: ARBUCKLE GROUP Elevation: 2082 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 3234 to 3250
Formation tested: Topeka | Date, Time: 01-FEB-97; 17:47:51 |
|
Initial Hydro Pressure: 1623 PSI
First Initial Flow Pressure: 13 PSI First Final Flow Pressure: 18 PSI Initial Shut-in Pressure: 901 PSI Second Initial Flow Pressure: 19 PSI Second Final Flow Pressure: 20 PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 1594 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3247 ft. |
|
Initial Flow: Weak 1/8"" blow died in 28 minutes Initial Shut In: Final Flow: Opened tool; no blow; pulled tool after 3 minutes Final Shut In: |
|
|
Bottom Hole Temperature: 100 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 20 of Total Fluid 20 of Fluid in Drill Pipe 20 of Watery Mud 30% water 70% mud | |
| View Pressures | View Recovery Gas |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 3268 to 3350
Formation tested: Toronto/ Lansing A | Date, Time: 02-FEB-97; 07:20:08 |
|
Initial Hydro Pressure: 1627 PSI
First Initial Flow Pressure: 14 PSI First Final Flow Pressure: 19 PSI Initial Shut-in Pressure: 842 PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 1619 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3279 ft. |
|
Initial Flow: Weak 1/8"" blow died in 20 minutes Final Flow: none taken |
|
|
Bottom Hole Temperature: 96 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 8 of Total Fluid 8 of Fluid in Drill Pipe 8 of Mud | |
| View Pressures | View Recovery Gas |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 3372 to 3490
Formation tested: Lansing H-K | Date, Time: 02-FEB-97; 22:26:58 |
|
Initial Hydro Pressure: 1682 PSI
First Initial Flow Pressure: 15 PSI First Final Flow Pressure: 34 PSI Initial Shut-in Pressure: 1038 PSI Second Initial Flow Pressure: 37 PSI Second Final Flow Pressure: 52 PSI Final Shut-in Pressure: 1025 PSI Final Hydro Pressure: 1658 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3371 ft. |
|
Initial Flow: Weak 1/2"" blow building to 1 1/4"" Initial Shut In: Final Flow: 1/8"" blow building to 1 1/2"" Final Shut In: |
|
|
Bottom Hole Temperature: 103 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 80 of Total Fluid 80 of Fluid in Drill Pipe 1 of Clean Oil 79 of Oil specked Muddy Water trace oil 38000 of Salinity (PPM) | |
| View Pressures | View Recovery Gas |