Drill Stem Tests Database
Specific Well--15-163-23294
API: 15-163-23294
Operator: Hinkle Oil Co.
Field: Wildcat
Lease: Griebel
Well 1
Location: T6S R19W, Sec. 33, NW SE NW
1650 South, 1650 East, from NW corner
Longitude: -99.4472208
Latitude: 39.4910258
County: Rooks
Status: D&A
Spud Date: 29-JAN-97
Completion Date: 03-FEB-97
Plugging Date: 03-FEB-97
Total Depth: 3600
Form. at depth: ARBUCKLE GROUP
Elevation: 2082 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 3234 to 3250
Formation tested: Topeka
Date, Time: 01-FEB-97; 17:47:51
Initial Hydro Pressure: 1623 PSI
First Initial Flow Pressure: 13 PSI
First Final Flow Pressure: 18 PSI
Initial Shut-in Pressure: 901 PSI
Second Initial Flow Pressure: 19 PSI
Second Final Flow Pressure: 20 PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: 1594 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3247 ft.
Initial Flow: Weak 1/8"" blow died in 28 minutes Initial Shut In:
Final Flow: Opened tool; no blow; pulled tool after 3 minutes
Final Shut In:
Bottom Hole Temperature: 100 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
20 of Total Fluid
20 of Fluid in Drill Pipe
20 of Watery Mud 30% water 70% mud
View Pressures View Recovery Gas
 
Test Number: 2 Data Source: TRILOBITE
Interval: 3268 to 3350
Formation tested: Toronto/ Lansing A
Date, Time: 02-FEB-97; 07:20:08
Initial Hydro Pressure: 1627 PSI
First Initial Flow Pressure: 14 PSI
First Final Flow Pressure: 19 PSI
Initial Shut-in Pressure: 842 PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: 1619 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3279 ft.
Initial Flow: Weak 1/8"" blow died in 20 minutes
Final Flow: none taken
Bottom Hole Temperature: 96 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
8 of Total Fluid
8 of Fluid in Drill Pipe
8 of Mud
View Pressures View Recovery Gas
 
Test Number: 3 Data Source: TRILOBITE
Interval: 3372 to 3490
Formation tested: Lansing H-K
Date, Time: 02-FEB-97; 22:26:58
Initial Hydro Pressure: 1682 PSI
First Initial Flow Pressure: 15 PSI
First Final Flow Pressure: 34 PSI
Initial Shut-in Pressure: 1038 PSI
Second Initial Flow Pressure: 37 PSI
Second Final Flow Pressure: 52 PSI
Final Shut-in Pressure: 1025 PSI
Final Hydro Pressure: 1658 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3371 ft.
Initial Flow: Weak 1/2"" blow building to 1 1/4"" Initial Shut In:
Final Flow: 1/8"" blow building to 1 1/2""
Final Shut In:
Bottom Hole Temperature: 103 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
80 of Total Fluid
80 of Fluid in Drill Pipe
1 of Clean Oil
79 of Oil specked Muddy Water trace oil
38000 of Salinity (PPM)
View Pressures View Recovery Gas