|
API: 15-163-23300
Operator: American Energies Corp. Field: Ordway West Lease: Dauwe 'B' Well 3 |
Location: T10S R18W, Sec. 30, SW NE SE
1650 North, 990 West, from SE corner Longitude: -99.3665092 Latitude: 39.1520481 County: Rooks Status: D&A |
Spud Date: 06/04/1997
Completion Date: 06/10/1997 Plugging Date: 06/10/1997 Total Depth: 3650 Form. at depth: ARBUCKLE GROUP Elevation: 2058 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 3204 to 3230
Formation tested: Plattsmouth | Date, Time: 06/08/1997; 06:18:11 |
|
Initial Hydro Pressure: 1575 PSI
First Initial Flow Pressure: 17 PSI First Final Flow Pressure: 38 PSI Initial Shut-in Pressure: 613 PSI Second Initial Flow Pressure: 38 PSI Second Final Flow Pressure: 47 PSI Final Shut-in Pressure: 535 PSI Final Hydro Pressure: 1552 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 185 ft. Drill Pipe Length: 3012 ft. |
|
Initial Flow- weak 1/4"" building to 1"" Initial Shutin- no blow Final Flow- no blow flushed tool no blow after surge Final Shutin- no blow |
|
|
Bottom Hole Temperature: 101 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 61 of Total Fluid 61 of Fluid in Drill Collars 61 of Mud w/oil specks | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 3300 to 3385
Formation tested: Lansing B-F | Date, Time: 06/09/1997; 02:13:46 |
|
Initial Hydro Pressure: 1682 PSI
First Initial Flow Pressure: 65 PSI First Final Flow Pressure: 234 PSI Initial Shut-in Pressure: 506 PSI Second Initial Flow Pressure: 237 PSI Second Final Flow Pressure: 315 PSI Final Shut-in Pressure: 508 PSI Final Hydro Pressure: 1658 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 185 ft. Drill Pipe Length: 3107 ft. |
|
Initial Flow- weak 1"" building bottom of bucket in 8 minutes Initial Shutin- no blow Final Flow- 1/2"" blow building to bottom of bucket in 18 minutes Final Shutin- no blow |
|
|
Bottom Hole Temperature: 106 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 490 of Total Fluid 185 of Fluid in Drill Collars 305 of Fluid in Drill Pipe 490 of Slightly Muddy Water 56000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 3460 to 3520
Formation tested: Lansing J,K,L | Date, Time: 06/09/1997; 20:31:05 |
|
Initial Hydro Pressure: 1786 PSI
First Initial Flow Pressure: 29 PSI First Final Flow Pressure: 39 PSI Initial Shut-in Pressure: 357 PSI Second Initial Flow Pressure: 41 PSI Second Final Flow Pressure: 45 PSI Final Shut-in Pressure: 275 PSI Final Hydro Pressure: 1793 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 185 ft. Drill Pipe Length: 3264 ft. |
|
Initial Flow- weak 1/2"" blow died in 15 minutes Initial Shutin- no blow Final Flow- no blow flush tool no blow after surge Final Shutin- no blow |
|
|
Bottom Hole Temperature: 103 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 5 of Total Fluid 5 of Fluid in Drill Collars 5 of Mud 56000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |