Drill Stem Tests Database
Specific Well--15-165-21680
API: 15-165-21680
Operator: Eagle Energy, Inc.
Field: Hampton Northeast
Lease: F. Littler
Well 1
Location: T16S R19W, Sec. 32, NE NE
780 South, 4350 West, from NE corner
Longitude: -99.4538761
Latitude: 38.623488
County: Rush
Status: OIL-P&A
Spud Date: 14-AUG-95
Completion Date: 21-AUG-95
Plugging Date: 23-MAY-00
Total Depth: 3897
Form. at depth: ARBUCKLE GROUP
Elevation: 2058 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 3789 to 3810
Formation tested: Arbuckle
Date, Time: 10-JUN-99; 14:41:10
Initial Hydro Pressure: 2112 PSI
First Initial Flow Pressure: 5 PSI
First Final Flow Pressure: 8 PSI
Initial Shut-in Pressure: 14 PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: 2043 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3791 ft.
Initial Flow: Weak died in 5 mins.
Bottom Hole Temperature: 114 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
2 of Total Fluid
2 of Fluid in Drill Pipe
2 of Drilling mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.