Drill Stem Tests Database
Specific Well--15-165-21698
API: 15-165-21698
Operator: CROSS BAR PETROLEUM / L. D. DRILLING, INC.
Field: Poho
Lease: HOLOPIREK, J.
Well 1-31
Location: T18S R17W, Sec. 31, N2 NW NW
495 South, 660 East, from NW corner
Longitude: -99.2506318
Latitude: 38.4491747
County: Rush
Status: D&A
Spud Date: 03/21/1996
Completion Date: 03/30/1996
Plugging Date: 03/30/1996
Total Depth: 3850
Form. at depth: ARBUCKLE GROUP
Elevation: 2003 KB

Download DST Test Data

Test Number: 2 Data Source: TRILOBITE
Interval: 3764 to 3778
Formation tested: ARBUCKLE
Date, Time: 03/28/1996; 08:24:03
Initial Hydro Pressure: 1803 PSI
First Initial Flow Pressure: 145 PSI
First Final Flow Pressure: 266 PSI
Initial Shut-in Pressure: 847 PSI
Second Initial Flow Pressure: 296 PSI
Second Final Flow Pressure: 364 PSI
Final Shut-in Pressure: 806 PSI
Final Hydro Pressure: 1780 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 248 ft.
Drill Pipe Length: 3512 ft.
Initial Flow - Strong blow, bottom of bucket in 2 min
Initial Shutin - Weak blow, .25"" - .5""
Final Flow - Strong blow, bottom of bucket in 12 min
Bottom Hole Temperature: 120 DEG F
Percent Porosity: 12
Samples: NONE
Gas Recovery:
Comments:
Recovery
780 of Total Fluid
248 of Fluid in Drill Collars
532 of Fluid in Drill Pipe
25 of Clean oil - 100% oil
250 of Slightly oil cut muddy water -
505 of Muddy water - 95% water, 5% mud
14 of Pay (est)
55000 of Salinity (PPM)
34.2 of Gravity (API)
View Pressures No Recovery Gas data.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 3690 to 3764
Formation tested: ARBUCKLE
Date, Time: 03/29/1996; 08:42:21
Initial Hydro Pressure: 1814 PSI
First Initial Flow Pressure: 30 PSI
First Final Flow Pressure: 37 PSI
Initial Shut-in Pressure: 758 PSI
Second Initial Flow Pressure: 40 PSI
Second Final Flow Pressure: 44 PSI
Final Shut-in Pressure: 779 PSI
Final Hydro Pressure: 1759 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 248 ft.
Drill Pipe Length: 3447 ft.
Initial Flow - Weak blow, .5""
Final Flow - No blow
Bottom Hole Temperature: 109 DEG F
Percent Porosity: 10
Samples: NONE
Gas Recovery:
Comments:
Recovery
20 of Total Fluid
20 of Fluid in Drill Collars
20 of Slightly oil cut mud - 2% oil, 98% mud
10 of Pay (est)
8000 of Salinity (PPM)
View Pressures No Recovery Gas data.