API: 15-165-21698
Operator: CROSS BAR PETROLEUM / L. D. DRILLING, INC. Field: Poho Lease: HOLOPIREK, J. Well 1-31 |
Location: T18S R17W, Sec. 31, N2 NW NW
495 South, 660 East, from NW corner Longitude: -99.2506318 Latitude: 38.4491747 County: Rush Status: D&A |
Spud Date: 21-MAR-96
Completion Date: 30-MAR-96 Plugging Date: 30-MAR-96 Total Depth: 3850 Form. at depth: ARBUCKLE GROUP Elevation: 2003 KB |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 3764 to 3778
Formation tested: ARBUCKLE | Date, Time: 28-MAR-96; 08:24:03 |
Initial Hydro Pressure: 1803 PSI
First Initial Flow Pressure: 145 PSI First Final Flow Pressure: 266 PSI Initial Shut-in Pressure: 847 PSI Second Initial Flow Pressure: 296 PSI Second Final Flow Pressure: 364 PSI Final Shut-in Pressure: 806 PSI Final Hydro Pressure: 1780 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 248 ft. Drill Pipe Length: 3512 ft. |
Initial Flow - Strong blow, bottom of bucket in 2 min Initial Shutin - Weak blow, .25"" - .5"" Final Flow - Strong blow, bottom of bucket in 12 min |
|
Bottom Hole Temperature: 120 DEG F
Percent Porosity: 12 Samples: NONE Gas Recovery: Comments: | |
Recovery 780 of Total Fluid 248 of Fluid in Drill Collars 532 of Fluid in Drill Pipe 25 of Clean oil - 100% oil 250 of Slightly oil cut muddy water - 505 of Muddy water - 95% water, 5% mud 14 of Pay (est) 55000 of Salinity (PPM) 34.2 of Gravity (API) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 3690 to 3764
Formation tested: ARBUCKLE | Date, Time: 29-MAR-96; 08:42:21 |
Initial Hydro Pressure: 1814 PSI
First Initial Flow Pressure: 30 PSI First Final Flow Pressure: 37 PSI Initial Shut-in Pressure: 758 PSI Second Initial Flow Pressure: 40 PSI Second Final Flow Pressure: 44 PSI Final Shut-in Pressure: 779 PSI Final Hydro Pressure: 1759 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 248 ft. Drill Pipe Length: 3447 ft. |
Initial Flow - Weak blow, .5"" Final Flow - No blow |
|
Bottom Hole Temperature: 109 DEG F
Percent Porosity: 10 Samples: NONE Gas Recovery: Comments: | |
Recovery 20 of Total Fluid 20 of Fluid in Drill Collars 20 of Slightly oil cut mud - 2% oil, 98% mud 10 of Pay (est) 8000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |