|
API: 15-189-22310
Operator: Oxy USA, Inc. Field: Younggren Northeast Lease: MLP CAVNER 'B' Well 1 |
Location: T31S R38W, Sec. 32, NE SW SW
503 North, 1092 East, from SW corner Longitude: -101.4799405 Latitude: 37.302278 County: Stevens Status: GAS-P&A |
Spud Date: 17-JUL-99
Completion Date: 03-SEP-99 Plugging Date: Total Depth: 6175 Form. at depth: ST LOUIS Elevation: 3196 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 5810 to 5835
Formation tested: Morrow | Date, Time: 27-JUL-99; 18:46:09 |
|
Initial Hydro Pressure: 791 PSI
First Initial Flow Pressure: PSI First Final Flow Pressure: PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 779 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 591 ft. Drill Pipe Length: 5209 ft. |
| Bride at 1692' 8 5/8 set to 1709' Suspect a joint of 8 5/8 off | |
|
Bottom Hole Temperature: 104 DEG F
Percent Porosity: 8 Samples: Gas Recovery: Comments: | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 5810 to 5835
Formation tested: Morrow | Date, Time: 27-JUL-99; 23:53:05 |
|
Initial Hydro Pressure: 896 PSI
First Initial Flow Pressure: PSI First Final Flow Pressure: PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 734 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 591 ft. Drill Pipe Length: 5209 ft. |
| Hit bridge at 1662' 8 5/8 set at 1709 Tool was not opened, 1 hard band tore off saftey joint, 1 5' perf bent | |
|
Bottom Hole Temperature: 98 DEG F
Percent Porosity: 8 Samples: Gas Recovery: Comments: | |
| View Pressures | No Recovery Gas data. |