Drill Stem Tests Database
Specific Well--15-167-23152
API: 15-167-23152
Operator: PELICAN HILL OIL & GAS
Field: Hall-Gurney
Lease: NUSS
Well 1
Location: T14S R12W, Sec. 33, S2 S2 SW
330 North, 1320 East, from SW corner
Longitude: -98.6646498
Latitude: 38.7851011
County: Russell
Status: OIL
Spud Date: 12/11/1997
Completion Date: 12/17/1998
Plugging Date:
Total Depth: 3190
Form. at depth: GORHAM SANDSTONE (REAGAN SANDSTONE)
Elevation: 1744 KB
L.K. Wireline listed as original op on OWWO ACO-1.

Download DST Test Data

Test Number: 3 Data Source: TRILOBITE
Interval: 2987 to 2998
Formation tested: LKC G Zone
Date, Time: 12/16/1997; 12:56:59
Initial Hydro Pressure: 1475 PSI
First Initial Flow Pressure: 18 PSI
First Final Flow Pressure: 31 PSI
Initial Shut-in Pressure: 464 PSI
Second Initial Flow Pressure: 31 PSI
Second Final Flow Pressure: 49 PSI
Final Shut-in Pressure: 389 PSI
Final Hydro Pressure: 1417 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 2997 ft.
Initial Flow: Fair Blow 3"". Initial Shutin: Very weak blowback.
Final Flow: Strong Blow 10"".
Final Shutin: Weak blowback.
Bottom Hole Temperature: 92 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
80 of Total Fluid
80 of Fluid in Drill Pipe
50 of Gas in pipe
20 of Oil[30%] Water[30%] cut Mud[40%]
60 of Oil[15%] & Water[65%] cut Mud[20%]
60000 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 3182 to 3190
Formation tested: Gorham sand
Date, Time: 12/17/1997; 06:58:39
Initial Hydro Pressure: 1596 PSI
First Initial Flow Pressure: 14 PSI
First Final Flow Pressure: 17 PSI
Initial Shut-in Pressure: 71 PSI
Second Initial Flow Pressure: 14 PSI
Second Final Flow Pressure: 17 PSI
Final Shut-in Pressure: 118 PSI
Final Hydro Pressure: 1570 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3187 ft.
Initial Flow: Very weak blow.
Final Flow: No blow. *Hydraulic tool did not close coming off of bottom may have affected recorder.
Bottom Hole Temperature: 93 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
5 of Total Fluid
5 of Fluid in Drill Pipe
5 of Oil cut mud 20% oil 80% mud
View Pressures No Recovery Gas data.