API: 15-171-20507
Operator: NORTH AMERICAN RES Field: Modoc Lease: ROBINSON FARMS Well 31-1 |
Location: T18S R34W, Sec. 31, SW NE NE
1080 South, 1080 West, from NE corner Longitude: -101.1128404 Latitude: 38.4502452 County: Scott Status: D&A |
Spud Date: 22-JAN-97
Completion Date: 02-FEB-97 Plugging Date: 02-FEB-97 Total Depth: 5100 Form. at depth: MISSISSIPPIAN Elevation: 3160 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4662 to 4695
Formation tested: Cherokee | Date, Time: 29-JAN-97; 17:45:31 |
Initial Hydro Pressure: 2295 PSI
First Initial Flow Pressure: 13 PSI First Final Flow Pressure: 15 PSI Initial Shut-in Pressure: 1037 PSI Second Initial Flow Pressure: 17 PSI Second Final Flow Pressure: 15 PSI Final Shut-in Pressure: 972 PSI Final Hydro Pressure: 2271 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4074 ft. |
Initial Flow: Weak 1/4"" blow steady throughout Initial Shut In: No return blow Final Flow: Weak surface blow, died in 10 mins Final Shut In: No return blow |
|
Bottom Hole Temperature: 116 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 5 of Total Fluid 5 of Fluid in Drill Pipe 5 of Drilling Mud 6500 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 4820 to 5100
Formation tested: Morrow | Date, Time: 01-FEB-97; 07:00:41 |
Initial Hydro Pressure: 2481 PSI
First Initial Flow Pressure: 164 PSI First Final Flow Pressure: 512 PSI Initial Shut-in Pressure: 1169 PSI Second Initial Flow Pressure: 488 PSI Second Final Flow Pressure: 766 PSI Final Shut-in Pressure: 1151 PSI Final Hydro Pressure: 2407 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4508 ft. |
Initial Flow: Strong blow off bttm in 3 mins. Initial Shut In: Bled off blow, no return Final Flow: Weak blow built to 1/2"" then died @ 18 mins Final Shut In: No Shut In |
|
Bottom Hole Temperature: 130 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 1675 of Total Fluid 1675 of Fluid in Drill Pipe 310 of Drilling Mud 1365 of Muddy Water 25000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |