|
API: 15-171-20508
Operator: CROSS BAR PETROLEUM, INC. Field: Scott City Southeast Lease: Freed Well 1-28 |
Location: T17S R32W, Sec. 28, NE SW
1980 North, 1980 East, from SW corner Longitude: -100.8631813 Latitude: 38.5461321 County: Scott Status: OIL-P&A |
Spud Date: 14-FEB-97
Completion Date: 03-MAR-97 Plugging Date: 29-OCT-98 Total Depth: 5422 Form. at depth: ARBUCKLE GROUP Elevation: 2986 KB |
| Test Number: 5 | Data Source: TRILOBITE |
|
Interval: 4602 to 4650
Formation tested: Morrow Sand | Date, Time: 24-FEB-97; 02:25:16 |
|
Initial Hydro Pressure: 2239 PSI
First Initial Flow Pressure: 21 PSI First Final Flow Pressure: 51 PSI Initial Shut-in Pressure: 1150 PSI Second Initial Flow Pressure: 58 PSI Second Final Flow Pressure: 87 PSI Final Shut-in Pressure: 1130 PSI Final Hydro Pressure: 2222 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 247 ft. Drill Pipe Length: 4358 ft. |
|
Initial Flow: 1/4"" blow slowly built to 2"" Initial Shut In: Bled off blow, no return Final Flow: Weak to fair blow off bottom in 40 min Final Shut In: Bled off blow, no return |
|
|
Bottom Hole Temperature: 127 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 140 of Total Fluid 140 of Fluid in Drill Collars 330 of Gas In Pipe Above Fluid 140 of Gas Oil Cut Mud 45%gas 15%oil 40%mud | |
| View Pressures | No Recovery Gas data. |