|
API: 15-171-20509
Operator: CROSS BAR PETROLEUM, INC. Field: Scott City Lease: Erskin 'A' Well 1-28 |
Location: T17S R32W, Sec. 28, NW NW NE
330 South, 2310 West, from NE corner Longitude: -100.8596831 Latitude: 38.5543478 County: Scott Status: OIL-P&A |
Spud Date: 02/01/1997
Completion Date: 02/25/1997 Plugging Date: 03/05/2002 Total Depth: 4790 Form. at depth: MISSISSIPPIAN Elevation: 2988 KB |
| Test Number: 5 | Data Source: TRILOBITE |
|
Interval: 4608 to 4658
Formation tested: Morrow | Date, Time: 02/11/1997; 04:36:26 |
|
Initial Hydro Pressure: 2360 PSI
First Initial Flow Pressure: 137 PSI First Final Flow Pressure: 285 PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: 293 PSI Second Final Flow Pressure: 483 PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 2326 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.5 in. Drill Collar Length: 248 ft. Drill Pipe Length: 4386 ft. |
|
Initial Flow: Mud dropped at open - pull tool loose, reset, 1/4"" at open built to bottom of bucket in 45 mins Initial Shut In: Bled off blow no return Final Flow: Weak surface blow built to bottom of in 52 mins Final Shut In: Bled off blow no return |
|
|
Bottom Hole Temperature: 132 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 836 of Total Fluid 248 of Fluid in Drill Collars 588 of Fluid in Drill Pipe 836 of Drilling Mud trace of Oil 1%oil 99%mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 6 | Data Source: TRILOBITE |
|
Interval: 4584 to 4658
Formation tested: Morrow | Date, Time: 02/11/1997; 15:38:01 |
|
Initial Hydro Pressure: 2351 PSI
First Initial Flow Pressure: 21 PSI First Final Flow Pressure: 198 PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 2318 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.5 in. Drill Collar Length: 248 ft. Drill Pipe Length: 4386 ft. |
| Initial Flow: 1/4"" blow building to 9"", mud dropped 2' per min Pulled Tool | |
|
Bottom Hole Temperature: 127 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 340 of Total Fluid 248 of Fluid in Drill Collars 92 of Fluid in Drill Pipe 340 of Drilling Mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 7 | Data Source: TRILOBITE |
|
Interval: 4484 to 4655
Formation tested: Morrow | Date, Time: 02/13/1997; 03:48:36 |
|
Initial Hydro Pressure: 2344 PSI
First Initial Flow Pressure: 36 PSI First Final Flow Pressure: 84 PSI Initial Shut-in Pressure: 1025 PSI Second Initial Flow Pressure: 92 PSI Second Final Flow Pressure: 103 PSI Final Shut-in Pressure: 988 PSI Final Hydro Pressure: 2322 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.5 in. Drill Collar Length: 248 ft. Drill Pipe Length: 4513 ft. |
|
Initial Flow: 1/8"" blow built to 1 1/4"" in 40 mins, died back to 3/4"" Intital Shut In: No return Final Flow: Bubble to open tool, no blow Final Shut In: No return |
|
|
Bottom Hole Temperature: 126 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 130 of Total Fluid 130 of Fluid in Drill Collars 130 of Drilling Mud with spec's of Oil | |
| View Pressures | No Recovery Gas data. |