Drill Stem Tests Database
Specific Well--15-171-20509
API: 15-171-20509
Operator: CROSS BAR PETROLEUM, INC.
Field: Scott City
Lease: Erskin 'A'
Well 1-28
Location: T17S R32W, Sec. 28, NW NW NE
330 South, 2310 West, from NE corner
Longitude: -100.8596831
Latitude: 38.5543478
County: Scott
Status: OIL-P&A
Spud Date: 02/01/1997
Completion Date: 02/25/1997
Plugging Date: 03/05/2002
Total Depth: 4790
Form. at depth: MISSISSIPPIAN
Elevation: 2988 KB

Download DST Test Data

Test Number: 5 Data Source: TRILOBITE
Interval: 4608 to 4658
Formation tested: Morrow
Date, Time: 02/11/1997; 04:36:26
Initial Hydro Pressure: 2360 PSI
First Initial Flow Pressure: 137 PSI
First Final Flow Pressure: 285 PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: 293 PSI
Second Final Flow Pressure: 483 PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: 2326 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.5 in.
Drill Collar Length: 248 ft.
Drill Pipe Length: 4386 ft.
Initial Flow: Mud dropped at open - pull tool loose, reset, 1/4"" at open built to bottom of bucket in 45 mins Initial Shut In: Bled off blow no return
Final Flow: Weak surface blow built to bottom of in 52 mins
Final Shut In: Bled off blow no return
Bottom Hole Temperature: 132 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
836 of Total Fluid
248 of Fluid in Drill Collars
588 of Fluid in Drill Pipe
836 of Drilling Mud trace of Oil 1%oil 99%mud
View Pressures No Recovery Gas data.
 
Test Number: 6 Data Source: TRILOBITE
Interval: 4584 to 4658
Formation tested: Morrow
Date, Time: 02/11/1997; 15:38:01
Initial Hydro Pressure: 2351 PSI
First Initial Flow Pressure: 21 PSI
First Final Flow Pressure: 198 PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: 2318 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.5 in.
Drill Collar Length: 248 ft.
Drill Pipe Length: 4386 ft.
Initial Flow: 1/4"" blow building to 9"", mud dropped 2' per min Pulled Tool
Bottom Hole Temperature: 127 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
340 of Total Fluid
248 of Fluid in Drill Collars
92 of Fluid in Drill Pipe
340 of Drilling Mud
View Pressures No Recovery Gas data.
 
Test Number: 7 Data Source: TRILOBITE
Interval: 4484 to 4655
Formation tested: Morrow
Date, Time: 02/13/1997; 03:48:36
Initial Hydro Pressure: 2344 PSI
First Initial Flow Pressure: 36 PSI
First Final Flow Pressure: 84 PSI
Initial Shut-in Pressure: 1025 PSI
Second Initial Flow Pressure: 92 PSI
Second Final Flow Pressure: 103 PSI
Final Shut-in Pressure: 988 PSI
Final Hydro Pressure: 2322 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.5 in.
Drill Collar Length: 248 ft.
Drill Pipe Length: 4513 ft.
Initial Flow: 1/8"" blow built to 1 1/4"" in 40 mins, died back to 3/4"" Intital Shut In: No return
Final Flow: Bubble to open tool, no blow
Final Shut In: No return
Bottom Hole Temperature: 126 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
130 of Total Fluid
130 of Fluid in Drill Collars
130 of Drilling Mud with spec's of Oil
View Pressures No Recovery Gas data.