|
API: 15-173-20891
Operator: MAREXCO INC ETAL Field: Wildcat Lease: ZOGELMAN Well 41-18 |
Location: T28S R3W, Sec. 18, NE NE
660 South, 660 West, from NE corner Longitude: -97.6814996 Latitude: 37.6173347 County: Sedgwick Status: D&A |
Spud Date: 07/05/1996
Completion Date: 07/13/1996 Plugging Date: 07/31/1996 Total Depth: 4360 Form. at depth: ARBUCKLE GROUP Elevation: 1441 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 3611 to 3775
Formation tested: MISS. | Date, Time: 07/10/1996; 22:23:40 |
|
Initial Hydro Pressure: 1829 PSI
First Initial Flow Pressure: 28 PSI First Final Flow Pressure: 39 PSI Initial Shut-in Pressure: 1219 PSI Second Initial Flow Pressure: 42 PSI Second Final Flow Pressure: 72 PSI Final Shut-in Pressure: 1162 PSI Final Hydro Pressure: 1731 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3618 ft. |
| INITIAL FLOW - WEAK BLOW 1"" - 2.25"" IN WATER FINAL FLOW - WEAK BLOW .25"" - 2.25"" IN WATER | |
|
Bottom Hole Temperature: 119 DEG F
Percent Porosity: 10 Samples: Gas Recovery: Comments: | |
|
Recovery 105 of Total Fluid 105 of Fluid in Drill Pipe 105 of MUD 10 of PAY (est) 8500 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 4151 to 4280
Formation tested: SIMOSON SD. | Date, Time: 07/11/1996; 13:08:32 |
|
Initial Hydro Pressure: 2048 PSI
First Initial Flow Pressure: 87 PSI First Final Flow Pressure: 264 PSI Initial Shut-in Pressure: 1602 PSI Second Initial Flow Pressure: 266 PSI Second Final Flow Pressure: 620 PSI Final Shut-in Pressure: 1602 PSI Final Hydro Pressure: 1996 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4146 ft. |
|
Initial Flow - Strong blow, bottom of bucket in 8 min Final Flow - Strong blow, bottom of bucket in 8.5 min |
|
|
Bottom Hole Temperature: 137 DEG F
Percent Porosity: 12 Samples: Gas Recovery: Comments: | |
|
Recovery 1380 of Total Fluid 1380 of Fluid in Drill Pipe 78 of Water cut mud - 12% Water, 88% Mud 372 of Water cut mud - 27% Water, 73% Mud 186 of Water cut mud - 50% Water, 50% Mud 310 of Mud cut water - 72% Water, 28% Mud 434 of Slightly gas cut water - 100% Water 29 of Pay (est) 76000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |