|
API: 15-175-21528
Operator: Anadarko Petroleum Corp. Field: Wildcat Lease: Conover 'B' Well 2 |
Location: T31S R34W, Sec. 22, NW SE SE
1250 North, 1250 West, from SE corner Longitude: -100.9996449 Latitude: 37.3327322 County: Seward Status: D&A |
Spud Date: 19-FEB-96
Completion Date: 13-APR-96 Plugging Date: Total Depth: 5800 Form. at depth: ST. LOUIS LIMESTONE Elevation: 2879 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 5555 to 5595
Formation tested: Chester | Date, Time: 03-MAR-96; 14:00:26 |
|
Initial Hydro Pressure: 2663 PSI
First Initial Flow Pressure: 72 PSI First Final Flow Pressure: 86 PSI Initial Shut-in Pressure: 915 PSI Second Initial Flow Pressure: 88 PSI Second Final Flow Pressure: 106 PSI Final Shut-in Pressure: 1344 PSI Final Hydro Pressure: 2590 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 646 ft. Drill Pipe Length: 4908 ft. |
|
Initial Flow - Picked up 3"" blow sliding 10' to bottom, blow decreased to 2"" then built to 5"" at final Initial Shutin - Bled off blow, no return Final Flow - Weak to fair blow, slowly built off bottom in 7.5 min Final Shutin - Bled off blow, no return |
|
|
Bottom Hole Temperature: 137 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 185 of Total Fluid 185 of Fluid in Drill Collars 95 of Drlg. Mud w/oil spots 90 of Slightly gassy oil cut mud - 2500 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |