Drill Stem Tests Database
Specific Well--15-175-21567
API: 15-175-21567
Operator: Anadarko Petroleum Corp.
Field: Silverman North
Lease: Conover 'B'
Well 3
Location: T31S R34W, Sec. 22, SW NE NE
1250 South, 1250 West, from NE corner
Longitude: -100.9996457
Latitude: 37.3404706
County: Seward
Status: D&A
Spud Date: 17-SEP-96
Completion Date: 30-SEP-96
Plugging Date: 30-SEP-96
Total Depth: 5900
Form. at depth: ST. LOUIS LIMESTONE
Elevation: 2940 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 5380 to 5464
Formation tested: Upper Morrow
Date, Time: 26-SEP-96; 19:05:36
Initial Hydro Pressure: 2645 PSI
First Initial Flow Pressure: 20 PSI
First Final Flow Pressure: 30 PSI
Initial Shut-in Pressure: 48 PSI
Second Initial Flow Pressure: 30 PSI
Second Final Flow Pressure: 33 PSI
Final Shut-in Pressure: 48 PSI
Final Hydro Pressure: 2607 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 500 ft.
Drill Pipe Length: 4853 ft.
Initial Flow - Weak surface blow for 15 min then no blow
Final Flow - No blow
Bottom Hole Temperature: 123 DEG F
Percent Porosity:
Samples: NO
Gas Recovery:
Comments:
Recovery
10 of Total Fluid
10 of Fluid in Drill Collars
10 of Drilling mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.