|
API: 15-175-21577
Operator: R.C.Taylor Companies, Inc. Field: Adobe Lease: Kansas City Life Well 3 |
Location: T35S R31W, Sec. 3, NE SW NE NE
810 South, 735 West, from NE corner Longitude: -100.671439 Latitude: 37.0369293 County: Seward Status: O&G |
Spud Date: 07-NOV-96
Completion Date: 17-NOV-96 Plugging Date: Total Depth: 5460 Form. at depth: MARMATON GROUP Elevation: 2691 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 2700 to 2717
Formation tested: Chase | Date, Time: 09-NOV-96; 02:33:36 |
|
Initial Hydro Pressure: 1303 PSI
First Initial Flow Pressure: 85 PSI First Final Flow Pressure: 92 PSI Initial Shut-in Pressure: 581 PSI Second Initial Flow Pressure: 76 PSI Second Final Flow Pressure: 97 PSI Final Shut-in Pressure: 580 PSI Final Hydro Pressure: 1274 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 621 ft. Drill Pipe Length: 2078 ft. |
|
Initial Flow - Strong blow. Bottom of bucket in 12 min. Final Flow - Strong blow. Bottom of bucket in 1 min. Gas to surface in 14 min. Too small to measure. |
|
|
Bottom Hole Temperature: 88 DEG F
Percent Porosity: 10 Samples: Gas Recovery: Comments: | |
|
Recovery 140 of Total Fluid 140 of Fluid in Drill Collars 140 of Gas cut mud 80%mud 20%gas | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 3182 to 3197
Formation tested: Council Grove | Date, Time: 10-NOV-96; 16:28:01 |
|
Initial Hydro Pressure: 1628 PSI
First Initial Flow Pressure: 27 PSI First Final Flow Pressure: 48 PSI Initial Shut-in Pressure: 809 PSI Second Initial Flow Pressure: 64 PSI Second Final Flow Pressure: 86 PSI Final Shut-in Pressure: 796 PSI Final Hydro Pressure: 1448 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 397 ft. Drill Pipe Length: 2822 ft. |
|
Initial Flow - Weak surface blow. Built to 2"" Final Flow - Weak surface blow. Built to 1-1/2"" |
|
|
Bottom Hole Temperature: 89 DEG F
Percent Porosity: 12 Samples: Gas Recovery: Comments: | |
|
Recovery 150 of Total Fluid 150 of Fluid in Drill Collars 150 of Water cut mud 40% water 60% mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 4595 to 4610
Formation tested: LANSING | Date, Time: 14-NOV-96; 03:51:41 |
|
Initial Hydro Pressure: 2388 PSI
First Initial Flow Pressure: 26 PSI First Final Flow Pressure: 30 PSI Initial Shut-in Pressure: 1318 PSI Second Initial Flow Pressure: 33 PSI Second Final Flow Pressure: 36 PSI Final Shut-in Pressure: 1298 PSI Final Hydro Pressure: 2186 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 353 ft. Drill Pipe Length: 4218 ft. |
|
Initial Flow - Weak 1/4"" surface blow Initial Shut-in - No return Final Flow - Bubble to open tool - no blow Final Shut-in - No return |
|
|
Bottom Hole Temperature: 115 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 20 of Total Fluid 20 of Fluid in Drill Collars 20 of drilling mud 100% mud oil specs | |
| View Pressures | No Recovery Gas data. |
| Test Number: 4 | Data Source: TRILOBITE |
|
Interval: 4852 to 4890
Formation tested: Drum | Date, Time: 15-NOV-96; 07:26:24 |
|
Initial Hydro Pressure: 2377 PSI
First Initial Flow Pressure: 119 PSI First Final Flow Pressure: 196 PSI Initial Shut-in Pressure: 1487 PSI Second Initial Flow Pressure: 225 PSI Second Final Flow Pressure: 339 PSI Final Shut-in Pressure: 1477 PSI Final Hydro Pressure: 2318 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 353 ft. Drill Pipe Length: 4494 ft. |
|
Initial Flow - Bottom of bucket in 1-1/2 min. Initial Shut-in - Bleed off blow 9 min. Weak surface return in 2 min. - built to 2"" Final Flow - 2"" at open - bottom of bucket in 1-1/2 min. Gas to surface in 11 min. Final Shut-in - Bleed off blow 27 min. - return in 1 min. - built to 6"" |
|
|
Bottom Hole Temperature: 124 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 848 of Total Fluid 353 of Fluid in Drill Collars 495 of Fluid in Drill Pipe 228 of clean gassy oil 40% gas 60%oil 350 of gassy oil water and mud cut 25%g 30%o 20%w 270 of slightly gassy mud cut water - trace oil 76000 of Salinity (PPM) 36 of Gravity (API) | |
| View Pressures | View Recovery Gas |