Drill Stem Tests Database
Specific Well--15-175-21577
API: 15-175-21577
Operator: R.C.Taylor Companies, Inc.
Field: Adobe
Lease: Kansas City Life
Well 3
Location: T35S R31W, Sec. 3, NE SW NE NE
810 South, 735 West, from NE corner
Longitude: -100.671439
Latitude: 37.0369293
County: Seward
Status: O&G
Spud Date: 07-NOV-96
Completion Date: 17-NOV-96
Plugging Date:
Total Depth: 5460
Form. at depth: MARMATON GROUP
Elevation: 2691 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 2700 to 2717
Formation tested: Chase
Date, Time: 09-NOV-96; 02:33:36
Initial Hydro Pressure: 1303 PSI
First Initial Flow Pressure: 85 PSI
First Final Flow Pressure: 92 PSI
Initial Shut-in Pressure: 581 PSI
Second Initial Flow Pressure: 76 PSI
Second Final Flow Pressure: 97 PSI
Final Shut-in Pressure: 580 PSI
Final Hydro Pressure: 1274 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 621 ft.
Drill Pipe Length: 2078 ft.
Initial Flow - Strong blow. Bottom of bucket in 12 min.
Final Flow - Strong blow. Bottom of bucket in 1 min. Gas to surface in 14 min. Too small to measure.
Bottom Hole Temperature: 88 DEG F
Percent Porosity: 10
Samples:
Gas Recovery:
Comments:
Recovery
140 of Total Fluid
140 of Fluid in Drill Collars
140 of Gas cut mud 80%mud 20%gas
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 3182 to 3197
Formation tested: Council Grove
Date, Time: 10-NOV-96; 16:28:01
Initial Hydro Pressure: 1628 PSI
First Initial Flow Pressure: 27 PSI
First Final Flow Pressure: 48 PSI
Initial Shut-in Pressure: 809 PSI
Second Initial Flow Pressure: 64 PSI
Second Final Flow Pressure: 86 PSI
Final Shut-in Pressure: 796 PSI
Final Hydro Pressure: 1448 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 397 ft.
Drill Pipe Length: 2822 ft.
Initial Flow - Weak surface blow. Built to 2""
Final Flow - Weak surface blow. Built to 1-1/2""
Bottom Hole Temperature: 89 DEG F
Percent Porosity: 12
Samples:
Gas Recovery:
Comments:
Recovery
150 of Total Fluid
150 of Fluid in Drill Collars
150 of Water cut mud 40% water 60% mud
View Pressures No Recovery Gas data.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 4595 to 4610
Formation tested: LANSING
Date, Time: 14-NOV-96; 03:51:41
Initial Hydro Pressure: 2388 PSI
First Initial Flow Pressure: 26 PSI
First Final Flow Pressure: 30 PSI
Initial Shut-in Pressure: 1318 PSI
Second Initial Flow Pressure: 33 PSI
Second Final Flow Pressure: 36 PSI
Final Shut-in Pressure: 1298 PSI
Final Hydro Pressure: 2186 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 353 ft.
Drill Pipe Length: 4218 ft.
Initial Flow - Weak 1/4"" surface blow Initial Shut-in - No return
Final Flow - Bubble to open tool - no blow
Final Shut-in - No return
Bottom Hole Temperature: 115 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
20 of Total Fluid
20 of Fluid in Drill Collars
20 of drilling mud 100% mud oil specs
View Pressures No Recovery Gas data.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 4852 to 4890
Formation tested: Drum
Date, Time: 15-NOV-96; 07:26:24
Initial Hydro Pressure: 2377 PSI
First Initial Flow Pressure: 119 PSI
First Final Flow Pressure: 196 PSI
Initial Shut-in Pressure: 1487 PSI
Second Initial Flow Pressure: 225 PSI
Second Final Flow Pressure: 339 PSI
Final Shut-in Pressure: 1477 PSI
Final Hydro Pressure: 2318 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 353 ft.
Drill Pipe Length: 4494 ft.
Initial Flow - Bottom of bucket in 1-1/2 min. Initial Shut-in - Bleed off blow 9 min. Weak surface return in 2 min. - built to 2""
Final Flow - 2"" at open - bottom of bucket in 1-1/2 min. Gas to surface in 11 min.
Final Shut-in - Bleed off blow 27 min. - return in 1 min. - built to 6""
Bottom Hole Temperature: 124 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
848 of Total Fluid
353 of Fluid in Drill Collars
495 of Fluid in Drill Pipe
228 of clean gassy oil 40% gas 60%oil
350 of gassy oil water and mud cut 25%g 30%o 20%w
270 of slightly gassy mud cut water - trace oil
76000 of Salinity (PPM)
36 of Gravity (API)
View Pressures View Recovery Gas