|
API: 15-175-21585
Operator: Hugoton Energy Corp. Field: Cutter Lease: MLP Young Trust Well 4-5 |
Location: T31S R34W, Sec. 5, E2 NW NE NE
330 South, 880 West, from NE corner Longitude: -101.0348558 Latitude: 37.3868319 County: Seward Status: OIL |
Spud Date: 07-JAN-97
Completion Date: 21-FEB-97 Plugging Date: Total Depth: 5725 Form. at depth: ST. LOUIS LIMESTONE Elevation: 2804 KB |
| Later op. Oxy USA. | ||
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 5410 to 5486
Formation tested: Chester | Date, Time: 17-JAN-97; 13:08:00 |
|
Initial Hydro Pressure: 2634 PSI
First Initial Flow Pressure: 25 PSI First Final Flow Pressure: 35 PSI Initial Shut-in Pressure: 440 PSI Second Initial Flow Pressure: 45 PSI Second Final Flow Pressure: 56 PSI Final Shut-in Pressure: 437 PSI Final Hydro Pressure: 2477 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: in. Drill Collar Length: ft. Drill Pipe Length: 5450 ft. |
|
Initial Flow: Fair blow, built to bottom of bucket in 14 mins Initial Shut In: Bled off 2 inches, .5 inch blow back Final Flow: Strong blow bottom of bucket soon as open tool Final Shut In: Bled off 2 inches, 1 inch blow back |
|
|
Bottom Hole Temperature: 121 DEG F
Percent Porosity: Samples: NO Gas Recovery: Comments: | |
|
Recovery 90 of Total Fluid 90 of Fluid in Drill Pipe 810 of Gas in Pipe 30 of Slight Oil Cut Mud 10%Oil 90%Mud 60 of Slight Gas & Oil Cut Mud 7%Gas 3%Oil 90%Mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 5 | Data Source: TRILOBITE |
|
Interval: 5408 to 5530
Formation tested: Chester | Date, Time: 19-JAN-97; 16:43:50 |
|
Initial Hydro Pressure: 2842 PSI
First Initial Flow Pressure: 50 PSI First Final Flow Pressure: 79 PSI Initial Shut-in Pressure: 1031 PSI Second Initial Flow Pressure: 101 PSI Second Final Flow Pressure: 97 PSI Final Shut-in Pressure: 1002 PSI Final Hydro Pressure: 2431 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 61 ft. Drill Pipe Length: 5325 ft. |
|
Initial Flow: Initial Shut In: Final Flow: No blow Final Shut In: |
|
|
Bottom Hole Temperature: 125 DEG F
Percent Porosity: Samples: NO Gas Recovery: Comments: | |
|
Recovery 90 of Total Fluid 61 of Fluid in Drill Collars 9 of Fluid in Drill Pipe 70 of 100% Drilling Mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 6 | Data Source: TRILOBITE |
|
Interval: 5537 to 5620
Formation tested: Chester | Date, Time: 20-JAN-97; 01:20:22 |
|
Initial Hydro Pressure: 2783 PSI
First Initial Flow Pressure: 45 PSI First Final Flow Pressure: 78 PSI Initial Shut-in Pressure: 1269 PSI Second Initial Flow Pressure: 144 PSI Second Final Flow Pressure: 160 PSI Final Shut-in Pressure: 1211 PSI Final Hydro Pressure: 2680 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 5917 in. Drill Collar Length: 621 ft. Drill Pipe Length: ft. |
|
Initial FLow: Initial Shut In: Final Flow: Now Blow Fianl Shut In: |
|
|
Bottom Hole Temperature: 126 DEG F
Percent Porosity: Samples: NO Gas Recovery: Comments: | |
|
Recovery 130 of Total Fluid 61 of Fluid in Drill Collars 69 of Fluid in Drill Pipe 130 of 100% Drilling Mud | |
| View Pressures | No Recovery Gas data. |