Drill Stem Tests Database
Specific Well--15-175-21585
API: 15-175-21585
Operator: Hugoton Energy Corp.
Field: Cutter
Lease: MLP Young Trust
Well 4-5
Location: T31S R34W, Sec. 5, E2 NW NE NE
330 South, 880 West, from NE corner
Longitude: -101.0348558
Latitude: 37.3868319
County: Seward
Status: OIL
Spud Date: 07-JAN-97
Completion Date: 21-FEB-97
Plugging Date:
Total Depth: 5725
Form. at depth: ST. LOUIS LIMESTONE
Elevation: 2804 KB
Later op. Oxy USA.

Download DST Test Data

Test Number: 3 Data Source: TRILOBITE
Interval: 5410 to 5486
Formation tested: Chester
Date, Time: 17-JAN-97; 13:08:00
Initial Hydro Pressure: 2634 PSI
First Initial Flow Pressure: 25 PSI
First Final Flow Pressure: 35 PSI
Initial Shut-in Pressure: 440 PSI
Second Initial Flow Pressure: 45 PSI
Second Final Flow Pressure: 56 PSI
Final Shut-in Pressure: 437 PSI
Final Hydro Pressure: 2477 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: in.
Drill Collar Length: ft.
Drill Pipe Length: 5450 ft.
Initial Flow: Fair blow, built to bottom of bucket in 14 mins Initial Shut In: Bled off 2 inches, .5 inch blow back
Final Flow: Strong blow bottom of bucket soon as open tool
Final Shut In: Bled off 2 inches, 1 inch blow back
Bottom Hole Temperature: 121 DEG F
Percent Porosity:
Samples: NO
Gas Recovery:
Comments:
Recovery
90 of Total Fluid
90 of Fluid in Drill Pipe
810 of Gas in Pipe
30 of Slight Oil Cut Mud 10%Oil 90%Mud
60 of Slight Gas & Oil Cut Mud 7%Gas 3%Oil 90%Mud
View Pressures No Recovery Gas data.
 
Test Number: 5 Data Source: TRILOBITE
Interval: 5408 to 5530
Formation tested: Chester
Date, Time: 19-JAN-97; 16:43:50
Initial Hydro Pressure: 2842 PSI
First Initial Flow Pressure: 50 PSI
First Final Flow Pressure: 79 PSI
Initial Shut-in Pressure: 1031 PSI
Second Initial Flow Pressure: 101 PSI
Second Final Flow Pressure: 97 PSI
Final Shut-in Pressure: 1002 PSI
Final Hydro Pressure: 2431 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 61 ft.
Drill Pipe Length: 5325 ft.
Initial Flow: Initial Shut In:
Final Flow: No blow
Final Shut In:
Bottom Hole Temperature: 125 DEG F
Percent Porosity:
Samples: NO
Gas Recovery:
Comments:
Recovery
90 of Total Fluid
61 of Fluid in Drill Collars
9 of Fluid in Drill Pipe
70 of 100% Drilling Mud
View Pressures No Recovery Gas data.
 
Test Number: 6 Data Source: TRILOBITE
Interval: 5537 to 5620
Formation tested: Chester
Date, Time: 20-JAN-97; 01:20:22
Initial Hydro Pressure: 2783 PSI
First Initial Flow Pressure: 45 PSI
First Final Flow Pressure: 78 PSI
Initial Shut-in Pressure: 1269 PSI
Second Initial Flow Pressure: 144 PSI
Second Final Flow Pressure: 160 PSI
Final Shut-in Pressure: 1211 PSI
Final Hydro Pressure: 2680 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 5917 in.
Drill Collar Length: 621 ft.
Drill Pipe Length: ft.
Initial FLow: Initial Shut In:
Final Flow: Now Blow Fianl Shut In:
Bottom Hole Temperature: 126 DEG F
Percent Porosity:
Samples: NO
Gas Recovery:
Comments:
Recovery
130 of Total Fluid
61 of Fluid in Drill Collars
69 of Fluid in Drill Pipe
130 of 100% Drilling Mud
View Pressures No Recovery Gas data.