API: 15-175-21587
Operator: Berexco, Inc. Field: Wildcat Lease: Eubank Well 1-24 |
Location: T31S R33W, Sec. 24, SE NE SW
1650 North, 2970 West, from SE corner Longitude: -100.8605424 Latitude: 37.3343132 County: Seward Status: D&A |
Spud Date: 12/21/1996
Completion Date: 01/07/1997 Plugging Date: 01/08/1997 Total Depth: 5889 Form. at depth: ST. LOUIS LIMESTONE Elevation: 2883 KB |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 4877 to 4931
Formation tested: Marmaton | Date, Time: 01/01/1997; 05:45:16 |
Initial Hydro Pressure: 2217 PSI
First Initial Flow Pressure: 125 PSI First Final Flow Pressure: 356 PSI Initial Shut-in Pressure: 1316 PSI Second Initial Flow Pressure: 403 PSI Second Final Flow Pressure: 599 PSI Final Shut-in Pressure: 1340 PSI Final Hydro Pressure: 2152 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 621 ft. Drill Pipe Length: 4267 ft. |
Initial Flow: Strong blow, bottom of bucket in 2 min Intial Shut In: Bled off blow, bottom of bucket blow back in 50 min Final Flow: Strong Blow, bottom of bucket in 5 min Final Shut In: Bled off blow, 2 inches surface blow back throught |
|
Bottom Hole Temperature: 119 DEG F
Percent Porosity: Samples: NO Gas Recovery: Comments: | |
Recovery 1200 of Total Fluid 621 of Fluid in Drill Collars 579 of Fluid in Drill Pipe 100 of 100% Drilling Mud with spec oil 180 of Slight Oil Gas Cut Mud Water 90 of Gas Mud Water 10%Gas 70%Water 20%Mud 870 of Salty Water 100% 40000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: | Data Source: TRILOBITE |
Interval: to
Formation tested: | Date, Time: 01/04/1997; 01:13:32 |
Tool Data Hole Size: in. Drill Collar ID: in. Drill Pipe ID: in. Drill Collar Length: ft. Drill Pipe Length: ft. |
|
Bottom Hole Temperature: DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 4 | Data Source: TRILOBITE |
Interval: 5369 to 5482
Formation tested: Morrow | Date, Time: 01/06/1997; 18:46:09 |
Initial Hydro Pressure: 2838 PSI
First Initial Flow Pressure: 89 PSI First Final Flow Pressure: 107 PSI Initial Shut-in Pressure: 448 PSI Second Initial Flow Pressure: 167 PSI Second Final Flow Pressure: 347 PSI Final Shut-in Pressure: 717 PSI Final Hydro Pressure: 2542 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 621 ft. Drill Pipe Length: 4730 ft. |
Initial Flow: Fair blow, bottom of bucket in 28 min. Initial Shut In: Bled off 2 in. No blow back Final Flow: Fair blow, bottom of bucket in 58 min. Fianl Shut In: Bled off 2 in. No blow Back |
|
Bottom Hole Temperature: 125 DEG F
Percent Porosity: Samples: NO Gas Recovery: Comments: | |
Recovery 105 of Total Fluid 105 of Fluid in Drill Collars 815 of Gas in pipe 105 of 100% Drilling Mud with spec of oil | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4880 to 4910
Formation tested: Marmaton | Date, Time: 12/31/1996; 11:05:58 |
Initial Hydro Pressure: 2461 PSI
First Initial Flow Pressure: 20 PSI First Final Flow Pressure: 32 PSI Initial Shut-in Pressure: 1148 PSI Second Initial Flow Pressure: 36 PSI Second Final Flow Pressure: 44 PSI Final Shut-in Pressure: 1064 PSI Final Hydro Pressure: 2262 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 2.25 ft. Drill Pipe Length: 3.8 ft. |
Initial Flow: Weak Surface blow built to 1 in Initial Shut In: Final Flow: No Blow Final Shut In: |
|
Bottom Hole Temperature: 119 DEG F
Percent Porosity: Samples: NO Gas Recovery: Comments: | |
Recovery 10 of Total Fluid 10 of Fluid in Drill Collars 80 of Gas in collar 10 of 100% Drilling Mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |