API: 15-175-21594
Operator: CROSS BAR PET Field: Three Star Lease: ROCO-BLASER Well 1-29 |
Location: T34S R32W, Sec. 29, NW NW
660 South, 660 East, from NW corner Longitude: -100.8298323 Latitude: 37.0669275 County: Seward Status: GAS |
Spud Date: 24-JAN-97
Completion Date: 10-MAY-97 Plugging Date: Total Depth: 6700 Form. at depth: ST. LOUIS LIMESTONE Elevation: 2780 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 5618 to 5794
Formation tested: Atoka | Date, Time: 05-FEB-97; 15:33:16 |
Initial Hydro Pressure: 2765 PSI
First Initial Flow Pressure: 45 PSI First Final Flow Pressure: 48 PSI Initial Shut-in Pressure: 69 PSI Second Initial Flow Pressure: 47 PSI Second Final Flow Pressure: 49 PSI Final Shut-in Pressure: 60 PSI Final Hydro Pressure: 2715 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 556 ft. Drill Pipe Length: 5060 ft. |
Initial Flow: Weak blow, built to 2.5 inches Initial Shut In: Final Flow: Weak blow, built to 1 inch Final Shut In: |
|
Bottom Hole Temperature: 120 DEG F
Percent Porosity: Samples: No Gas Recovery: Comments: | |
Recovery 60 of Total Fluid 60 of Fluid in Drill Collars 60 of Drilling Mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 6484 to 6560
Formation tested: St. Louis | Date, Time: 09-FEB-97; 23:29:04 |
Initial Hydro Pressure: 3242 PSI
First Initial Flow Pressure: 29 PSI First Final Flow Pressure: 48 PSI Initial Shut-in Pressure: 1862 PSI Second Initial Flow Pressure: 54 PSI Second Final Flow Pressure: 66 PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 3181 PSI |
Tool Data Hole Size: 6.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 525 ft. Drill Pipe Length: 5964 ft. |
Initial Flow: Weak blow, throughout Initial Shut In: Final Flow: No blow, Flushed tool, No Blow Final Shut In: |
|
Bottom Hole Temperature: 133 DEG F
Percent Porosity: Samples: No Gas Recovery: Comments: | |
Recovery 60 of Total Fluid 60 of Fluid in Drill Collars 60 of Drilling Mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |