|
API: 15-175-21698
Operator: Oxy USA, Inc. Field: Hugoton Gas Area Lease: Kapp 'A' Well 5 |
Location: T32S R34W, Sec. 16, SW SW NE NE
4070 North, 1240 West, from SE corner Longitude: -101.0176182 Latitude: 37.2683658 County: Seward Status: GAS |
Spud Date: 02/10/1998
Completion Date: 02/19/1998 Plugging Date: Total Depth: 6300 Form. at depth: ST. LOUIS LIMESTONE Elevation: 2929 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 5560 to 5700
Formation tested: Morrow | Date, Time: 02/17/1998; 15:46:57 |
|
Initial Hydro Pressure: PSI
First Initial Flow Pressure: PSI First Final Flow Pressure: PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 635 ft. Drill Pipe Length: 4925 ft. |
| IFP- misrun FFP- | |
|
Bottom Hole Temperature: DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 260 of Total Fluid 260 of Fluid in Drill Collars 260 of Mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 5565 to 5700
Formation tested: Morrow | Date, Time: 02/17/1998; 23:06:09 |
|
Initial Hydro Pressure: PSI
First Initial Flow Pressure: PSI First Final Flow Pressure: PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 635 ft. Drill Pipe Length: 4930 ft. |
| IFP- misrun packer failure FFP- | |
|
Bottom Hole Temperature: DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 635 of Total Fluid 635 of Fluid in Drill Collars 635 of Mud | |
| View Pressures | No Recovery Gas data. |