API: 15-179-21090
Operator: MURFIN DRILLING CO Field: Unknown Lease: MUIRHEAD FARMS Well 1-4 |
Location: T6S R27W, Sec. 4, E2 W2 NE
1320 South, 1700 West, from NE corner Longitude: -100.3354314 Latitude: 39.5640223 County: Sheridan Status: D&A |
Spud Date: 17-APR-97
Completion Date: 24-APR-97 Plugging Date: 24-APR-97 Total Depth: 4110 Form. at depth: MARMATON GROUP Elevation: 2605 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 3663 to 3687
Formation tested: KC | Date, Time: 21-APR-97; 21:15:44 |
Initial Hydro Pressure: 1667 PSI
First Initial Flow Pressure: 15 PSI First Final Flow Pressure: 21 PSI Initial Shut-in Pressure: 922 PSI Second Initial Flow Pressure: 24 PSI Second Final Flow Pressure: 30 PSI Final Shut-in Pressure: 771 PSI Final Hydro Pressure: 1657 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: in. Drill Pipe ID: in. Drill Collar Length: 505 ft. Drill Pipe Length: 3168 ft. |
Initial Flow: 1/4"" blow - blew throughout Initial Shut-in: No return Final Flow: Bubble to open tool - weak surface blow in 38 minutes - blew rest of open Final Shut-in: No return |
|
Bottom Hole Temperature: 111 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 15 of Total Fluid 15 of Fluid in Drill Collars 15 of drilling mud 100 % mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 3685 to 3710
Formation tested: Lansing KC | Date, Time: 22-APR-97; 10:05:39 |
Initial Hydro Pressure: 1687 PSI
First Initial Flow Pressure: 27 PSI First Final Flow Pressure: 43 PSI Initial Shut-in Pressure: 874 PSI Second Initial Flow Pressure: 44 PSI Second Final Flow Pressure: 48 PSI Final Shut-in Pressure: 742 PSI Final Hydro Pressure: 1660 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: in. Drill Collar Length: 505 ft. Drill Pipe Length: 3168 ft. |
Initial Flow: 1/2"" blow at open, built to 3"" Initial Shut In: No return Final Flow: Weak surface blow, blew throughout Final Shut In: No return |
|
Bottom Hole Temperature: 107 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 70 of Total Fluid 70 of Fluid in Drill Collars 70 of Slight Watery Mud 20% water 80%mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |