Drill Stem Tests Database
Specific Well--15-179-21090
API: 15-179-21090
Operator: MURFIN DRILLING CO
Field: Unknown
Lease: MUIRHEAD FARMS
Well 1-4
Location: T6S R27W, Sec. 4, E2 W2 NE
1320 South, 1700 West, from NE corner
Longitude: -100.3354314
Latitude: 39.5640223
County: Sheridan
Status: D&A
Spud Date: 04/17/1997
Completion Date: 04/24/1997
Plugging Date: 04/24/1997
Total Depth: 4110
Form. at depth: MARMATON GROUP
Elevation: 2605 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 3663 to 3687
Formation tested: KC
Date, Time: 04/21/1997; 21:15:44
Initial Hydro Pressure: 1667 PSI
First Initial Flow Pressure: 15 PSI
First Final Flow Pressure: 21 PSI
Initial Shut-in Pressure: 922 PSI
Second Initial Flow Pressure: 24 PSI
Second Final Flow Pressure: 30 PSI
Final Shut-in Pressure: 771 PSI
Final Hydro Pressure: 1657 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: in.
Drill Pipe ID: in.
Drill Collar Length: 505 ft.
Drill Pipe Length: 3168 ft.
Initial Flow: 1/4"" blow - blew throughout Initial Shut-in: No return
Final Flow: Bubble to open tool - weak surface blow in 38 minutes - blew rest of open
Final Shut-in: No return
Bottom Hole Temperature: 111 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
15 of Total Fluid
15 of Fluid in Drill Collars
15 of drilling mud 100 % mud
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 3685 to 3710
Formation tested: Lansing KC
Date, Time: 04/22/1997; 10:05:39
Initial Hydro Pressure: 1687 PSI
First Initial Flow Pressure: 27 PSI
First Final Flow Pressure: 43 PSI
Initial Shut-in Pressure: 874 PSI
Second Initial Flow Pressure: 44 PSI
Second Final Flow Pressure: 48 PSI
Final Shut-in Pressure: 742 PSI
Final Hydro Pressure: 1660 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: in.
Drill Pipe ID: in.
Drill Collar Length: 505 ft.
Drill Pipe Length: 3168 ft.
Initial Flow: 1/2"" blow at open, built to 3"" Initial Shut In: No return
Final Flow: Weak surface blow, blew throughout
Final Shut In: No return
Bottom Hole Temperature: 107 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
70 of Total Fluid
70 of Fluid in Drill Collars
70 of Slight Watery Mud 20% water 80%mud
View Pressures No Recovery Gas data.