Drill Stem Tests Database
Specific Well--15-185-23032
API: 15-185-23032
Operator: American Discovery Energy/Argent Energy
Field: Wildcat
Lease: Ade
Well 1
Location: T24S R12W, Sec. 31, NW SW NE
1500 South, 2300 West, from NE corner
Longitude: -98.6808476
Latitude: 37.9222273
County: Stafford
Status: D&A
Spud Date: 02-SEP-96
Completion Date: 11-SEP-96
Plugging Date: 11-SEP-96
Total Depth: 1910
Form. at depth: ARBUCKLE GROUP
Elevation: 1910 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 3756 to 3815
Formation tested: Lans.KC
Date, Time: 07-SEP-96; 18:58:52
Initial Hydro Pressure: 1842 PSI
First Initial Flow Pressure: 30 PSI
First Final Flow Pressure: 53 PSI
Initial Shut-in Pressure: 717 PSI
Second Initial Flow Pressure: 61 PSI
Second Final Flow Pressure: 78 PSI
Final Shut-in Pressure: 731 PSI
Final Hydro Pressure: 1798 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 545 ft.
Drill Pipe Length: 3198 ft.
Initial Flow - Fair Blow. Slow increase to 12"" in water
Final Flow - Weak blow. Slow increase to 4"" in water
Bottom Hole Temperature: 111 DEG F
Percent Porosity: 12
Samples: none
Gas Recovery:
Comments:
Recovery
120 of Total Fluid
120 of Fluid in Drill Collars
120 of Gas in pipe
60 of Drilling mud with oil specks
60 of Slightly oil cut mud - 1% oil, 99% mud
10 of Pay (est)
4000 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 3858 to 3910
Formation tested: Marmaton
Date, Time: 08-SEP-96; 13:26:19
Initial Hydro Pressure: 1911 PSI
First Initial Flow Pressure: 22 PSI
First Final Flow Pressure: 27 PSI
Initial Shut-in Pressure: 51 PSI
Second Initial Flow Pressure: 23 PSI
Second Final Flow Pressure: 24 PSI
Final Shut-in Pressure: 31 PSI
Final Hydro Pressure: 1834 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 545 ft.
Drill Pipe Length: 3320 ft.
Initial Flow - Weak blow, .25"" - .5"" in water
Final Flow - Very weak blow, dead in 12 minutes
Bottom Hole Temperature: 109 DEG F
Percent Porosity: 10
Samples: none
Gas Recovery:
Comments:
Recovery
15 of Total Fluid
15 of Fluid in Drill Collars
15 of Drilling mud
5 of Pay (est)
7000 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 4134 to 4153
Formation tested: Arbuckle
Date, Time: 09-SEP-96; 17:02:39
Initial Hydro Pressure: 2085 PSI
First Initial Flow Pressure: 19 PSI
First Final Flow Pressure: 18 PSI
Initial Shut-in Pressure: 14 PSI
Second Initial Flow Pressure: 13 PSI
Second Final Flow Pressure: 11 PSI
Final Shut-in Pressure: 13 PSI
Final Hydro Pressure: 1975 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 545 ft.
Drill Pipe Length: 3600 ft.
Initial Flow - Very weak blow, dead in 10 mins.
Final Flow - No blow
Bottom Hole Temperature: 114 DEG F
Percent Porosity: 10
Samples: none
Gas Recovery:
Comments:
Recovery
1 of Total Fluid
1 of Fluid in Drill Collars
1 of Drilling mud
5 of Pay (est)
7500 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 3867 to 3944
Formation tested: Stray Sand
Date, Time: 10-SEP-96; 20:42:54
Initial Hydro Pressure: 2048 PSI
First Initial Flow Pressure: 52 PSI
First Final Flow Pressure: 116 PSI
Initial Shut-in Pressure: 582 PSI
Second Initial Flow Pressure: 124 PSI
Second Final Flow Pressure: 151 PSI
Final Shut-in Pressure: 957 PSI
Final Hydro Pressure: 1896 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 545 ft.
Drill Pipe Length: 3322 ft.
Initial Flow - Strong blow, bottom of bucket in 19min
Initial Shutin - .25"" - .5"" in water
Final Flow - Strong blow, bottom of bucket in 10 - 15 secs
Final Shutin - .5"" - 3"" in water
Bottom Hole Temperature: 109 DEG F
Percent Porosity: 10
Samples: none
Gas Recovery:
Comments:
Recovery
250 of Total Fluid
250 of Fluid in Drill Collars
1590 of Gas in Pipe
70 of Gassy mud with oil specks - 15% gas, 85% mud
60 of Gassy oil cut mud - 25% gas, 10% oil, 65% mud
120 of Gassy oil cut mud - 25% gas, 30% oil, 45% mud
6 of Pay (est)
11000 of Salinity (PPM)
View Pressures No Recovery Gas data.