|
API: 15-185-23032
Operator: American Discovery Energy/Argent Energy Field: Wildcat Lease: Ade Well 1 |
Location: T24S R12W, Sec. 31, NW SW NE
1500 South, 2300 West, from NE corner Longitude: -98.6808476 Latitude: 37.9222273 County: Stafford Status: D&A |
Spud Date: 02-SEP-96
Completion Date: 11-SEP-96 Plugging Date: 11-SEP-96 Total Depth: 1910 Form. at depth: ARBUCKLE GROUP Elevation: 1910 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 3756 to 3815
Formation tested: Lans.KC | Date, Time: 07-SEP-96; 18:58:52 |
|
Initial Hydro Pressure: 1842 PSI
First Initial Flow Pressure: 30 PSI First Final Flow Pressure: 53 PSI Initial Shut-in Pressure: 717 PSI Second Initial Flow Pressure: 61 PSI Second Final Flow Pressure: 78 PSI Final Shut-in Pressure: 731 PSI Final Hydro Pressure: 1798 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 545 ft. Drill Pipe Length: 3198 ft. |
|
Initial Flow - Fair Blow. Slow increase to 12"" in water Final Flow - Weak blow. Slow increase to 4"" in water |
|
|
Bottom Hole Temperature: 111 DEG F
Percent Porosity: 12 Samples: none Gas Recovery: Comments: | |
|
Recovery 120 of Total Fluid 120 of Fluid in Drill Collars 120 of Gas in pipe 60 of Drilling mud with oil specks 60 of Slightly oil cut mud - 1% oil, 99% mud 10 of Pay (est) 4000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 3858 to 3910
Formation tested: Marmaton | Date, Time: 08-SEP-96; 13:26:19 |
|
Initial Hydro Pressure: 1911 PSI
First Initial Flow Pressure: 22 PSI First Final Flow Pressure: 27 PSI Initial Shut-in Pressure: 51 PSI Second Initial Flow Pressure: 23 PSI Second Final Flow Pressure: 24 PSI Final Shut-in Pressure: 31 PSI Final Hydro Pressure: 1834 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 545 ft. Drill Pipe Length: 3320 ft. |
|
Initial Flow - Weak blow, .25"" - .5"" in water Final Flow - Very weak blow, dead in 12 minutes |
|
|
Bottom Hole Temperature: 109 DEG F
Percent Porosity: 10 Samples: none Gas Recovery: Comments: | |
|
Recovery 15 of Total Fluid 15 of Fluid in Drill Collars 15 of Drilling mud 5 of Pay (est) 7000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 4134 to 4153
Formation tested: Arbuckle | Date, Time: 09-SEP-96; 17:02:39 |
|
Initial Hydro Pressure: 2085 PSI
First Initial Flow Pressure: 19 PSI First Final Flow Pressure: 18 PSI Initial Shut-in Pressure: 14 PSI Second Initial Flow Pressure: 13 PSI Second Final Flow Pressure: 11 PSI Final Shut-in Pressure: 13 PSI Final Hydro Pressure: 1975 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 545 ft. Drill Pipe Length: 3600 ft. |
|
Initial Flow - Very weak blow, dead in 10 mins. Final Flow - No blow |
|
|
Bottom Hole Temperature: 114 DEG F
Percent Porosity: 10 Samples: none Gas Recovery: Comments: | |
|
Recovery 1 of Total Fluid 1 of Fluid in Drill Collars 1 of Drilling mud 5 of Pay (est) 7500 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 4 | Data Source: TRILOBITE |
|
Interval: 3867 to 3944
Formation tested: Stray Sand | Date, Time: 10-SEP-96; 20:42:54 |
|
Initial Hydro Pressure: 2048 PSI
First Initial Flow Pressure: 52 PSI First Final Flow Pressure: 116 PSI Initial Shut-in Pressure: 582 PSI Second Initial Flow Pressure: 124 PSI Second Final Flow Pressure: 151 PSI Final Shut-in Pressure: 957 PSI Final Hydro Pressure: 1896 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 545 ft. Drill Pipe Length: 3322 ft. |
|
Initial Flow - Strong blow, bottom of bucket in 19min Initial Shutin - .25"" - .5"" in water Final Flow - Strong blow, bottom of bucket in 10 - 15 secs Final Shutin - .5"" - 3"" in water |
|
|
Bottom Hole Temperature: 109 DEG F
Percent Porosity: 10 Samples: none Gas Recovery: Comments: | |
|
Recovery 250 of Total Fluid 250 of Fluid in Drill Collars 1590 of Gas in Pipe 70 of Gassy mud with oil specks - 15% gas, 85% mud 60 of Gassy oil cut mud - 25% gas, 10% oil, 65% mud 120 of Gassy oil cut mud - 25% gas, 30% oil, 45% mud 6 of Pay (est) 11000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |