|
API: 15-187-20822
Operator: Amoco Production Co. Field: Sand Arroyo Lease: Second Schott Well 1-16 |
Location: T29S R39W, Sec. 16, NW NW
660 South, 660 East, from NW corner Longitude: -101.5963595 Latitude: 37.5315165 County: Stanton Status: D&A |
Spud Date: 07-MAY-96
Completion Date: 19-MAY-96 Plugging Date: 31-MAY-96 Total Depth: 5850 Form. at depth: MISSISSIPPIAN Elevation: 3224 KB |
| Test Number: | Data Source: TRILOBITE |
|
Interval: to
Formation tested: | Date, Time: 13-MAY-96; 13:15:48 |
|
Tool Data Hole Size: in. Drill Collar ID: in. Drill Pipe ID: in. Drill Collar Length: ft. Drill Pipe Length: ft. |
|
|
Bottom Hole Temperature: DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
| View Pressures | No Recovery Gas data. |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 5556 to 5670
Formation tested: Morrow | Date, Time: 18-MAY-96; 22:12:07 |
|
Initial Hydro Pressure: 2723 PSI
First Initial Flow Pressure: 331 PSI First Final Flow Pressure: 447 PSI Initial Shut-in Pressure: 716 PSI Second Initial Flow Pressure: 94 PSI Second Final Flow Pressure: 109 PSI Final Shut-in Pressure: 432 PSI Final Hydro Pressure: 2576 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 727 ft. Drill Pipe Length: 5063 ft. |
|
Initial Flow - Weak blow built to .5"" Final Flow - No blow |
|
|
Bottom Hole Temperature: 128 DEG F
Percent Porosity: 12 Samples: NO Gas Recovery: Comments: | |
|
Recovery 60 of Total Fluid 60 of Fluid in Drill Collars 60 of Drilling mud | |
| View Pressures | No Recovery Gas data. |