|
API: 15-187-20823
Operator: Amoco Production Co. Field: Liverpool Cemetery Lease: Mandy Jo Well 1-8 |
Location: T30S R39W, Sec. 8, W2 NW NE
660 South, 2310 West, from NE corner Longitude: -101.606192 Latitude: 37.4591564 County: Stanton Status: D&A |
Spud Date: 08-APR-96
Completion Date: 24-APR-96 Plugging Date: 30-APR-96 Total Depth: 5900 Form. at depth: MISSISSIPPIAN Elevation: 3232 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 5516 to 5555
Formation tested: Morrow | Date, Time: 22-APR-96; 04:28:12 |
|
Initial Hydro Pressure: PSI
First Initial Flow Pressure: PSI First Final Flow Pressure: PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 395 ft. Drill Pipe Length: 5120 ft. |
| *Bottom packers would not seat. | |
|
Bottom Hole Temperature: 128 DEG F
Percent Porosity: Samples: no Gas Recovery: Comments: | |
|
Recovery 585 of Total Fluid 395 of Fluid in Drill Collars 188 of Fluid in Drill Pipe 585 of Drilling mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 5521 to 5560
Formation tested: Morrow | Date, Time: 23-APR-96; 07:38:34 |
|
Initial Hydro Pressure: 2656 PSI
First Initial Flow Pressure: 104 PSI First Final Flow Pressure: 135 PSI Initial Shut-in Pressure: 1526 PSI Second Initial Flow Pressure: 180 PSI Second Final Flow Pressure: 387 PSI Final Shut-in Pressure: 1315 PSI Final Hydro Pressure: 2479 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 724 ft. Drill Pipe Length: 5119 ft. |
|
Initial Flow - Fair blow built to 5.5"" Initial Shutin - Bled off 2"", no blow back Final Flow - Surface blow built to bottom of bucket in 80 min Final Shutin - Bled off 2"", no blow back |
|
|
Bottom Hole Temperature: 128 DEG F
Percent Porosity: Samples: NO Gas Recovery: Comments: | |
|
Recovery 785 of Total Fluid 724 of Fluid in Drill Collars 61 of Fluid in Drill Pipe 275 of Muddy water - 50% mud, 50% water 449 of Watery mud - 75% water, 25% mud 24000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |