API: 15-187-20847
Operator: Berexco Inc. Field: Arroyo Northeast Lease: Earl Arnold Well 12-1 |
Location: T29S R41W, Sec. 12, S2 NW NE
4275 North, 2001 West, from SE corner Longitude: -101.7499783 Latitude: 37.5455409 County: Stanton Status: OIL |
Spud Date: 16-AUG-96
Completion Date: 31-OCT-96 Plugging Date: Total Depth: 5690 Form. at depth: ST. LOUIS LIMESTONE Elevation: 3350 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 5438 to 5468
Formation tested: Morrow | Date, Time: 23-AUG-96; 18:31:15 |
Initial Hydro Pressure: 2689 PSI
First Initial Flow Pressure: 34 PSI First Final Flow Pressure: 132 PSI Initial Shut-in Pressure: 1078 PSI Second Initial Flow Pressure: 138 PSI Second Final Flow Pressure: 172 PSI Final Shut-in Pressure: 1094 PSI Final Hydro Pressure: 2574 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 622 ft. Drill Pipe Length: 4812 ft. |
Initial Flow - Weak blow, built to 6"" Initial Shutin - No blow back Final Flow - Weak blow, Built to 9"" Final Shutin - No blow back |
|
Bottom Hole Temperature: 125 DEG F
Percent Porosity: Samples: No Gas Recovery: Comments: | |
Recovery 330 of Total Fluid 330 of Fluid in Drill Collars 330 of Slightly gas cut mud w/ trace oil - | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5468 to 5483
Formation tested: Morrow | Date, Time: 24-AUG-96; 14:11:19 |
Initial Hydro Pressure: 2568 PSI
First Initial Flow Pressure: 20 PSI First Final Flow Pressure: 30 PSI Initial Shut-in Pressure: 1052 PSI Second Initial Flow Pressure: 31 PSI Second Final Flow Pressure: 53 PSI Final Shut-in Pressure: 980 PSI Final Hydro Pressure: 2509 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 622 ft. Drill Pipe Length: 4842 ft. |
Initial Flow - Surface blow, built to 1"" Initial Shutin - No blow back Final Flow - Weak blow, Built to 10"" Final Shutin - Surface blow, Built to 1.5"" |
|
Bottom Hole Temperature: 127 DEG F
Percent Porosity: Samples: No Gas Recovery: Comments: | |
Recovery 93 of Total Fluid 93 of Fluid in Drill Collars 900 of Gas in pipe 5 of Clean gassy oil - 30% gas, 70% oil 88 of Gassy oil cut mud - 20% gas, 35% oil, 45% mud 43.4 of Gravity (API) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |