Drill Stem Tests Database
Specific Well--15-187-20852
API: 15-187-20852
Operator: Amoco Production Co.
Field: Sand Arroyo Creek Southwest
Lease: Amanda Jill
Well 1-36
Location: T29S R40W, Sec. 36, NW NW NW
4830 North, 4780 West, from SE corner
Longitude: -101.6513344
Latitude: 37.4887969
County: Stanton
Status: OIL
Spud Date: 04-SEP-96
Completion Date: 30-SEP-96
Plugging Date:
Total Depth: 5750
Form. at depth: MISSISSIPPIAN
Elevation: 3251 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4474 to 4503
Formation tested: Marmaton
Date, Time: 09-SEP-96; 19:31:28
Initial Hydro Pressure: 2129 PSI
First Initial Flow Pressure: 71 PSI
First Final Flow Pressure: 204 PSI
Initial Shut-in Pressure: 1230 PSI
Second Initial Flow Pressure: 214 PSI
Second Final Flow Pressure: 369 PSI
Final Shut-in Pressure: 1230 PSI
Final Hydro Pressure: 2114 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 724 ft.
Drill Pipe Length: 3741 ft.
Initial Flow - Strong blow off bottom in 15 seconds; Gas to surface in 13 minutes
Initial Shutin - Bled off blow, surface return built to bottom in 15 minutes
Final Flow - Fair to strong blow off bottom in 1 minute; gas gauged, burns blue flame
Final Shutin - Let 2"" blow down
Bottom Hole Temperature: 127 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
1050 of Total Fluid
724 of Fluid in Drill Collars
326 of Fluid in Drill Pipe
1050 of Gassy salt water - 5% gas, 95% water
30000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5590 to 5650
Formation tested: St. Louis
Date, Time: 13-SEP-96; 13:30:54
Initial Hydro Pressure: 2690 PSI
First Initial Flow Pressure: 688 PSI
First Final Flow Pressure: 806 PSI
Initial Shut-in Pressure: 1136 PSI
Second Initial Flow Pressure: 733 PSI
Second Final Flow Pressure: 889 PSI
Final Shut-in Pressure: 1133 PSI
Final Hydro Pressure: 2646 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 636 ft.
Drill Pipe Length: 4947 ft.
Initial Flow - Strong blow, bottom of bucket in 30 seconds; Gas to surface in 4 minutes; Oil to surface in 30 minutes
Final Flow - Strong blow, bottom of bucket immediately.
Bottom Hole Temperature: 139 DEG F
Percent Porosity:
Samples: Yes
Gas Recovery:
Comments:
Recovery
5583 of Total Fluid
636 of Fluid in Drill Collars
4947 of Fluid in Drill Pipe
5583 of Clean gassy oil - 40% gas, 60% oil
44.7 of Gravity (API)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.