Drill Stem Tests Database
Specific Well--15-187-20863
API: 15-187-20863
Operator: Stelbar Oil Corp.
Field: Wildcat
Lease: Wartman
Well 1-24
Location: T28S R42W, Sec. 24, SE NE SW
1650 North, 2000 East, from SW corner
Longitude: -101.8629949
Latitude: 37.5973428
County: Stanton
Status: D&A
Spud Date: 10/21/1996
Completion Date: 11/02/1996
Plugging Date: 11/30/1996
Total Depth: 5730
Form. at depth: ST. LOUIS LIMESTONE
Elevation: 3433 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 5380 to 5462
Formation tested: Morrow
Date, Time: 10/30/1996; 16:37:22
Initial Hydro Pressure: 2674 PSI
First Initial Flow Pressure: 126 PSI
First Final Flow Pressure: 129 PSI
Initial Shut-in Pressure: 195 PSI
Second Initial Flow Pressure: 129 PSI
Second Final Flow Pressure: 131 PSI
Final Shut-in Pressure: 168 PSI
Final Hydro Pressure: 2585 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 5158 ft.
Initial Flow - No blow. Tool slid 15 ft.
Final Flow - No blow
Bottom Hole Temperature: 120 DEG F
Percent Porosity:
Samples: No
Gas Recovery:
Comments:
Recovery
220 of Total Fluid
220 of Fluid in Drill Pipe
220 of Drilling Mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5620 to 5707
Formation tested: St. Louis
Date, Time: 11/01/1996; 18:31:04
Initial Hydro Pressure: 2884 PSI
First Initial Flow Pressure: 285 PSI
First Final Flow Pressure: 878 PSI
Initial Shut-in Pressure: 1382 PSI
Second Initial Flow Pressure: 902 PSI
Second Final Flow Pressure: 1289 PSI
Final Shut-in Pressure: 1421 PSI
Final Hydro Pressure: 2794 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 5376 ft.
Initial Flow - Strong blow - bottom of bucket 1 min. Initial Shut-in - No blow back
Final Flow - Strong blow - bottom of bucket in 3 min. - decreased back to 7 in.
Final Shut-in - No blow back
Bottom Hole Temperature: DEG F
Percent Porosity:
Samples: No
Gas Recovery:
Comments:
Recovery
2735 of Total Fluid
2735 of Fluid in Drill Pipe
2495 of 80% Water 20%Mud
240 of 60%Water 40%Mud
34000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.