API: 15-187-20866
Operator: Parker & Parsley, Inc. Field: Arroyo Lease: P & P Well 1-28 |
Location: T29S R41W, Sec. 28, W2 NW NE SE
2328 North, 1185 West, from SE corner Longitude: -101.8020691 Latitude: 37.49688 County: Stanton Status: OIL-P&A |
Spud Date: 25-MAR-97
Completion Date: 29-APR-97 Plugging Date: 19-NOV-14 Total Depth: 5760 Form. at depth: MISSISSIPPIAN Elevation: 3378 KB |
Later operator was Pioneer Natural Resources USA. |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 5306 to 5447
Formation tested: Morrow | Date, Time: 05-APR-97; 02:03:07 |
Initial Hydro Pressure: 2523 PSI
First Initial Flow Pressure: PSI First Final Flow Pressure: PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 2474 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 182 ft. Drill Pipe Length: 5533 ft. |
Initial Flow: Packer Failure Final Flow: |
|
Bottom Hole Temperature: 115 DEG F
Percent Porosity: Samples: No Gas Recovery: Comments: | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5361 to 5447
Formation tested: Morrow | Date, Time: 05-APR-97; 09:34:35 |
Initial Hydro Pressure: 2570 PSI
First Initial Flow Pressure: 68 PSI First Final Flow Pressure: 118 PSI Initial Shut-in Pressure: 1087 PSI Second Initial Flow Pressure: 129 PSI Second Final Flow Pressure: 149 PSI Final Shut-in Pressure: 1118 PSI Final Hydro Pressure: 2468 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 182 ft. Drill Pipe Length: 5533 ft. |
Initial Flow: Fair blow, bottom of bucket in 20 min Initial Shut In: No blow back Final Flow: Fair blow, bottom of bucket in 30 min Final Shut In: No blow back |
|
Bottom Hole Temperature: 126 DEG F
Percent Porosity: Samples: No Gas Recovery: Comments: | |
Recovery 250 of Total Fluid 182 of Fluid in Drill Collars 68 of Fluid in Drill Pipe 190 of Slight Gas & Oil Cut Mud 60 of Slight Oil Cut Watery Mud 53000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |