Drill Stem Tests Database
Specific Well--15-187-20873
API: 15-187-20873
Operator: Amoco Production Co.
Field: Liverpool Cemetery
Lease: Jay Morris
Well 1-8
Location: T30S R39W, Sec. 8, SE NW SE NW
3540 North, 3480 West, from SE corner
Longitude: -101.61033
Latitude: 37.45624
County: Stanton
Status: GAS-P&A
Spud Date: 21-FEB-97
Completion Date: 21-MAR-97
Plugging Date: 04-DEC-08
Total Depth: 5974
Form. at depth: ST. LOUIS LIMESTONE
Elevation: 3232 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 5638 to 5690
Formation tested: Morrow
Date, Time: 02-MAR-97; 15:49:35
Initial Hydro Pressure: 2705 PSI
First Initial Flow Pressure: 178 PSI
First Final Flow Pressure: 244 PSI
Initial Shut-in Pressure: 1242 PSI
Second Initial Flow Pressure: 207 PSI
Second Final Flow Pressure: 334 PSI
Final Shut-in Pressure: 1199 PSI
Final Hydro Pressure: 2652 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: in.
Drill Pipe ID: in.
Drill Collar Length: 677 ft.
Drill Pipe Length: 4971 ft.
Initial Flow: Bottom of bucket at gas to surface in 13.5 min. Initial Shut In: Bled off blow for 15 min, return in 2 min, built to 1/2"".
Final Flow: Bottom of bucket at open gauging gas
Final Shut In: Bled off blow for 27 min, weak return in 3 min, built to 1/4"".
Bottom Hole Temperature: 136 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
770 of Total Fluid
677 of Fluid in Drill Collars
93 of Fluid in Drill Pipe
93 of Slightly Gassy Mud
677 of Drilling Mud 100%mud
1200 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.