API: 15-187-20873
Operator: Amoco Production Co. Field: Liverpool Cemetery Lease: Jay Morris Well 1-8 |
Location: T30S R39W, Sec. 8, SE NW SE NW
3540 North, 3480 West, from SE corner Longitude: -101.61033 Latitude: 37.45624 County: Stanton Status: GAS-P&A |
Spud Date: 21-FEB-97
Completion Date: 21-MAR-97 Plugging Date: 04-DEC-08 Total Depth: 5974 Form. at depth: ST. LOUIS LIMESTONE Elevation: 3232 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 5638 to 5690
Formation tested: Morrow | Date, Time: 02-MAR-97; 15:49:35 |
Initial Hydro Pressure: 2705 PSI
First Initial Flow Pressure: 178 PSI First Final Flow Pressure: 244 PSI Initial Shut-in Pressure: 1242 PSI Second Initial Flow Pressure: 207 PSI Second Final Flow Pressure: 334 PSI Final Shut-in Pressure: 1199 PSI Final Hydro Pressure: 2652 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: in. Drill Collar Length: 677 ft. Drill Pipe Length: 4971 ft. |
Initial Flow: Bottom of bucket at gas to surface in 13.5 min. Initial Shut In: Bled off blow for 15 min, return in 2 min, built to 1/2"". Final Flow: Bottom of bucket at open gauging gas Final Shut In: Bled off blow for 27 min, weak return in 3 min, built to 1/4"". |
|
Bottom Hole Temperature: 136 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 770 of Total Fluid 677 of Fluid in Drill Collars 93 of Fluid in Drill Pipe 93 of Slightly Gassy Mud 677 of Drilling Mud 100%mud 1200 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |