Drill Stem Tests Database
Specific Well--15-187-20875
API: 15-187-20875
Operator: Stelbar Oil Corp.
Field: Dietterich
Lease: Roberts
Well 2-25
Location: T28S R41W, Sec. 25, NE NE SW
2310 North, 2298 East, from SW corner
Longitude: -101.7535308
Latitude: 37.5837471
County: Stanton
Status: D&A
Spud Date: 15-MAR-97
Completion Date: 28-MAR-97
Plugging Date: 28-MAR-97
Total Depth: 5730
Form. at depth: MISSISSIPPIAN
Elevation: 3347 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 5436 to 5498
Formation tested: Keys
Date, Time: 25-MAR-97; 13:19:39
Initial Hydro Pressure: 2646 PSI
First Initial Flow Pressure: 109 PSI
First Final Flow Pressure: 345 PSI
Initial Shut-in Pressure: 1351 PSI
Second Initial Flow Pressure: 356 PSI
Second Final Flow Pressure: 564 PSI
Final Shut-in Pressure: 1333 PSI
Final Hydro Pressure: 2588 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 369 ft.
Drill Pipe Length: 5081 ft.
Initial Flow: Fair blow, built to bottom of bucket in 9 minutes Initial Shut In: No blow back
Final Flow: Slow blow, built to bottom of bucket in 13 minutes
Final Shut In: Bled off 2"" surface blow back
Bottom Hole Temperature: 124 DEG F
Percent Porosity:
Samples: NO
Gas Recovery:
Comments:
Recovery
1140 of Total Fluid
369 of Fluid in Drill Collars
771 of Fluid in Drill Pipe
165 of Watery Mud
120 of Muddy Water
855 of Salt Water
62000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5506 to 5528
Formation tested: Keyes
Date, Time: 26-MAR-97; 19:26:46
Initial Hydro Pressure: 2742 PSI
First Initial Flow Pressure: 20 PSI
First Final Flow Pressure: 24 PSI
Initial Shut-in Pressure: 1360 PSI
Second Initial Flow Pressure: 26 PSI
Second Final Flow Pressure: 30 PSI
Final Shut-in Pressure: 1201 PSI
Final Hydro Pressure: 2665 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 369 ft.
Drill Pipe Length: 5115 ft.
Initial Flow: Weak surface blow Initial Shut In:
Final Flow: No blow
Final Shut In:
Bottom Hole Temperature: 125 DEG F
Percent Porosity:
Samples: NO
Gas Recovery:
Comments:
Recovery
20 of Total Fluid
20 of Fluid in Drill Collars
20 of Drilling Mud
22000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.