|
API: 15-187-20885
Operator: Berexco, Inc. Field: Arroyo Lease: Schroeder Well 1-16 |
Location: T29S R41W, Sec. 16, N2 NE NW
380 South, 1900 East, from NW corner Longitude: -101.8093609 Latitude: 37.5331374 County: Stanton Status: D&A |
Spud Date: 19-SEP-97
Completion Date: 01-OCT-97 Plugging Date: 01-OCT-97 Total Depth: 5740 Form. at depth: ST. LOUIS LIMESTONE Elevation: 3415 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 5350 to 5458
Formation tested: Morrow-Keys | Date, Time: 28-SEP-97; 08:45:06 |
|
Initial Hydro Pressure: 2507 PSI
First Initial Flow Pressure: 49 PSI First Final Flow Pressure: 78 PSI Initial Shut-in Pressure: 114 PSI Second Initial Flow Pressure: 45 PSI Second Final Flow Pressure: 91 PSI Final Shut-in Pressure: 134 PSI Final Hydro Pressure: 2442 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.68 in. Drill Collar Length: 715 ft. Drill Pipe Length: 4672 ft. |
|
Initial Flow: Weak surface blow, died in 8 mins Initial Shut In: Final Flow: blow and died Final Shut In: |
|
|
Bottom Hole Temperature: DEG F
Percent Porosity: Samples: NONE Gas Recovery: Comments: | |
|
Recovery 20 of Total Fluid 20 of Fluid in Drill Collars 20 of Drilling Mud | |
| View Pressures | No Recovery Gas data. |