Drill Stem Tests Database
Specific Well--15-187-20885
API: 15-187-20885
Operator: Berexco, Inc.
Field: Arroyo
Lease: Schroeder
Well 1-16
Location: T29S R41W, Sec. 16, N2 NE NW
380 South, 1900 East, from NW corner
Longitude: -101.8093609
Latitude: 37.5331374
County: Stanton
Status: D&A
Spud Date: 19-SEP-97
Completion Date: 01-OCT-97
Plugging Date: 01-OCT-97
Total Depth: 5740
Form. at depth: ST. LOUIS LIMESTONE
Elevation: 3415 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 5350 to 5458
Formation tested: Morrow-Keys
Date, Time: 28-SEP-97; 08:45:06
Initial Hydro Pressure: 2507 PSI
First Initial Flow Pressure: 49 PSI
First Final Flow Pressure: 78 PSI
Initial Shut-in Pressure: 114 PSI
Second Initial Flow Pressure: 45 PSI
Second Final Flow Pressure: 91 PSI
Final Shut-in Pressure: 134 PSI
Final Hydro Pressure: 2442 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.68 in.
Drill Collar Length: 715 ft.
Drill Pipe Length: 4672 ft.
Initial Flow: Weak surface blow, died in 8 mins Initial Shut In:
Final Flow: blow and died
Final Shut In:
Bottom Hole Temperature: DEG F
Percent Porosity:
Samples: NONE
Gas Recovery:
Comments:
Recovery
20 of Total Fluid
20 of Fluid in Drill Collars
20 of Drilling Mud
View Pressures No Recovery Gas data.