Drill Stem Tests Database
Specific Well--15-189-22153
API: 15-189-22153
Operator: Anadarko Petroleum Corp.
Field: Toni-Mike Northeast
Lease: Hittle 'A'
Well 5
Location: T31S R39W, Sec. 34, SW SE
660 North, 1980 West, from SE corner
Longitude: -101.5444869
Latitude: 37.3029199
County: Stevens
Status: GAS
Spud Date: 26-FEB-97
Completion Date: 04-APR-97
Plugging Date:
Total Depth: 6137
Form. at depth: MORROW
Elevation: 3233 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 5740 to 5805
Formation tested: Lower Morrow
Date, Time: 05-MAR-97; 22:07:29
Initial Hydro Pressure: PSI
First Initial Flow Pressure: PSI
First Final Flow Pressure: PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 721 ft.
Drill Pipe Length: 5042 ft.
Initinal Flow: Packer Failure
Bottom Hole Temperature: 127 DEG F
Percent Porosity:
Samples: NO
Gas Recovery:
Comments:
Recovery
580 of Total Fluid
580 of Fluid in Drill Collars
580 of 100% Drlg. Mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.