|
API: 15-189-22274
Operator: Anadarko Petroleum Corp. Field: Mouser Lease: Childs 'A' Well 1 |
Location: T35S R38W, Sec. 7, NE
3960 North, 1320 West, from SE corner Longitude: -101.487316 Latitude: 37.0211432 County: Stevens Status: OIL-P&A |
Spud Date: 02/05/1998
Completion Date: 02/19/1998 Plugging Date: 02/19/1998 Total Depth: 6850 Form. at depth: ST. LOUIS LIMESTONE Elevation: 3250 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 6580 to 6630
Formation tested: Morrow | Date, Time: 02/17/1998; 13:27:34 |
|
Initial Hydro Pressure: 3177 PSI
First Initial Flow Pressure: PSI First Final Flow Pressure: PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 3131 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 577 ft. Drill Pipe Length: 5996 ft. |
| IF; reset - no help TOH @ Co. Orders | |
|
Bottom Hole Temperature: 152 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 765 of Total Fluid 577 of Fluid in Drill Collars 188 of Fluid in Drill Pipe 765 of Drlg. Mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 6550 to 6350
Formation tested: Chester | Date, Time: 02/18/1998; 08:46:01 |
|
Initial Hydro Pressure: 3156 PSI
First Initial Flow Pressure: PSI First Final Flow Pressure: PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 3136 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 577 ft. Drill Pipe Length: 5965 ft. |
| IF; Packer failed to seat TOH @ Co Order | |
|
Bottom Hole Temperature: 137 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 220 of Total Fluid 220 of Fluid in Drill Collars 220 of Drlg. Mud | |
| View Pressures | No Recovery Gas data. |