|
API: 15-193-20664
Operator: WHITE & ELLIS DRILLING INC Field: Summers Lease: COOPER Well 1-29 |
Location: T10S R33W, Sec. 29, SE SE NW
3070 North, 2970 West, from SE corner Longitude: -101.0292514 Latitude: 39.1559225 County: Thomas Status: D&A |
Spud Date: 08/07/1997
Completion Date: 08/16/1997 Plugging Date: 08/16/1997 Total Depth: 4716 Form. at depth: MISSISSIPPIAN Elevation: 3129 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4260 to 4280
Formation tested: Lans/KC ""J"" | Date, Time: 08/13/1997; 22:47:11 |
|
Initial Hydro Pressure: 2064 PSI
First Initial Flow Pressure: 35 PSI First Final Flow Pressure: 177 PSI Initial Shut-in Pressure: 922 PSI Second Initial Flow Pressure: 193 PSI Second Final Flow Pressure: 279 PSI Final Shut-in Pressure: 852 PSI Final Hydro Pressure: 2013 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4261 ft. |
|
Initial Flow: Fair to strong blow off bottom in 5 mins. Initial Shut In: Bled off blow - no return Final Flow: Weak to fair blow off bottom in 13 min Final Shut In: Bled off blow - no return |
|
|
Bottom Hole Temperature: 130 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 620 of Total Fluid 620 of Fluid in Drill Pipe 620 of Salt Water 50000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 4280 to 4310
Formation tested: Lans/KC ""K"" | Date, Time: 08/13/1997; 11:30:18 |
|
Initial Hydro Pressure: 2059 PSI
First Initial Flow Pressure: 16 PSI First Final Flow Pressure: 121 PSI Initial Shut-in Pressure: 1304 PSI Second Initial Flow Pressure: 125 PSI Second Final Flow Pressure: 240 PSI Final Shut-in Pressure: 1272 PSI Final Hydro Pressure: 2020 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4291 ft. |
|
Initial Flow: Weak to fair blow off bottom in 12 min Initial Shut In: Bled off blow - surface return built 1"" Final Flow: Weak to fair blow off bottom in 12 min Final Shut In: Bled off blow - surface return built to 1"" |
|
|
Bottom Hole Temperature: 130 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 540 of Total Fluid 540 of Fluid in Drill Pipe 240 of Gas In Pipe 180 of Clean Gassy Oil 5%gas 95%oil 120 of Gassy Oil Stained Water Cut Mud 240 of Salt Water 100%water 44000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 4556 to 4630
Formation tested: Johnson | Date, Time: 08/15/1997; 22:35:25 |
|
Initial Hydro Pressure: 2225 PSI
First Initial Flow Pressure: 13 PSI First Final Flow Pressure: 38 PSI Initial Shut-in Pressure: 1060 PSI Second Initial Flow Pressure: 41 PSI Second Final Flow Pressure: 79 PSI Final Shut-in Pressure: 1044 PSI Final Hydro Pressure: 2213 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4541 ft. |
|
Initial Flow: Weak surface blow built to 3"" Initial Shut In: No return Final Flow: Weak surface blow built to 2"" Final Shut In: No return |
|
|
Bottom Hole Temperature: 129 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 150 of Total Fluid 150 of Fluid in Drill Pipe 150 of Oil Stained Mud | |
| View Pressures | No Recovery Gas data. |