Drill Stem Tests Database
Specific Well--15-193-20664
API: 15-193-20664
Operator: WHITE & ELLIS DRILLING INC
Field: Summers
Lease: COOPER
Well 1-29
Location: T10S R33W, Sec. 29, SE SE NW
3070 North, 2970 West, from SE corner
Longitude: -101.0292514
Latitude: 39.1559225
County: Thomas
Status: D&A
Spud Date: 08/07/1997
Completion Date: 08/16/1997
Plugging Date: 08/16/1997
Total Depth: 4716
Form. at depth: MISSISSIPPIAN
Elevation: 3129 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 4260 to 4280
Formation tested: Lans/KC ""J""
Date, Time: 08/13/1997; 22:47:11
Initial Hydro Pressure: 2064 PSI
First Initial Flow Pressure: 35 PSI
First Final Flow Pressure: 177 PSI
Initial Shut-in Pressure: 922 PSI
Second Initial Flow Pressure: 193 PSI
Second Final Flow Pressure: 279 PSI
Final Shut-in Pressure: 852 PSI
Final Hydro Pressure: 2013 PSI
Tool Data
Hole Size: 8.875 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4261 ft.
Initial Flow: Fair to strong blow off bottom in 5 mins. Initial Shut In: Bled off blow - no return
Final Flow: Weak to fair blow off bottom in 13 min
Final Shut In: Bled off blow - no return
Bottom Hole Temperature: 130 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
620 of Total Fluid
620 of Fluid in Drill Pipe
620 of Salt Water
50000 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4280 to 4310
Formation tested: Lans/KC ""K""
Date, Time: 08/13/1997; 11:30:18
Initial Hydro Pressure: 2059 PSI
First Initial Flow Pressure: 16 PSI
First Final Flow Pressure: 121 PSI
Initial Shut-in Pressure: 1304 PSI
Second Initial Flow Pressure: 125 PSI
Second Final Flow Pressure: 240 PSI
Final Shut-in Pressure: 1272 PSI
Final Hydro Pressure: 2020 PSI
Tool Data
Hole Size: 8.875 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4291 ft.
Initial Flow: Weak to fair blow off bottom in 12 min Initial Shut In: Bled off blow - surface return built 1""
Final Flow: Weak to fair blow off bottom in 12 min
Final Shut In: Bled off blow - surface return built to 1""
Bottom Hole Temperature: 130 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
540 of Total Fluid
540 of Fluid in Drill Pipe
240 of Gas In Pipe
180 of Clean Gassy Oil 5%gas 95%oil
120 of Gassy Oil Stained Water Cut Mud
240 of Salt Water 100%water
44000 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 4556 to 4630
Formation tested: Johnson
Date, Time: 08/15/1997; 22:35:25
Initial Hydro Pressure: 2225 PSI
First Initial Flow Pressure: 13 PSI
First Final Flow Pressure: 38 PSI
Initial Shut-in Pressure: 1060 PSI
Second Initial Flow Pressure: 41 PSI
Second Final Flow Pressure: 79 PSI
Final Shut-in Pressure: 1044 PSI
Final Hydro Pressure: 2213 PSI
Tool Data
Hole Size: 8.875 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4541 ft.
Initial Flow: Weak surface blow built to 3"" Initial Shut In: No return
Final Flow: Weak surface blow built to 2""
Final Shut In: No return
Bottom Hole Temperature: 129 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
150 of Total Fluid
150 of Fluid in Drill Pipe
150 of Oil Stained Mud
View Pressures No Recovery Gas data.