Drill Stem Tests Database
Specific Well--15-193-20666
API: 15-193-20666
Operator: NOR-WEST KANSAS OIL, LLC.
Field: Albear
Lease: J. AND B INC.
Well 1
Location: T6S R33W, Sec. 2, SE SW SE
330 North, 1770 West, from SE corner
Longitude: -100.9667361
Latitude: 39.5547133
County: Thomas
Status: D&A
Spud Date: 12/16/1997
Completion Date: 12/30/1997
Plugging Date: 12/30/1997
Total Depth: 4635
Form. at depth: MISSISSIPPIAN
Elevation: 3116 KB

Download DST Test Data

Test Number: Data Source: TRILOBITE
Interval: to
Formation tested:
Date, Time: 12/26/1997; 20:13:48
  Tool Data
Hole Size: in.
Drill Collar ID: in.
Drill Pipe ID: in.
Drill Collar Length: ft.
Drill Pipe Length: ft.
Bottom Hole Temperature: DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4140 to 4180
Formation tested: J"" LKC
Date, Time: 12/27/1997; 19:14:44
Initial Hydro Pressure: 2077 PSI
First Initial Flow Pressure: 17 PSI
First Final Flow Pressure: 140 PSI
Initial Shut-in Pressure: 285 PSI
Second Initial Flow Pressure: 145 PSI
Second Final Flow Pressure: 210 PSI
Final Shut-in Pressure: 284 PSI
Final Hydro Pressure: 2062 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 534 ft.
Drill Pipe Length: 3608 ft.
Initial blow - Strong bottom of bucket in 26 min
Final blow - Weak building to 4""
Bottom Hole Temperature: 125 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
430 of Total Fluid
430 of Fluid in Drill Collars
10 of Clean oil 100% oil
300 of Slightly oil cut mud 5%oil 95%mud
120 of Slightly oil cut muddy water
26000 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 4416 to 4472
Formation tested: Cherokee
Date, Time: 12/29/1997; 06:32:26
Initial Hydro Pressure: 2272 PSI
First Initial Flow Pressure: 22 PSI
First Final Flow Pressure: 22 PSI
Initial Shut-in Pressure: 334 PSI
Second Initial Flow Pressure: 18 PSI
Second Final Flow Pressure: 21 PSI
Final Shut-in Pressure: 100 PSI
Final Hydro Pressure: 2242 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 534 ft.
Drill Pipe Length: 3886 ft.
Initial blow - Weak 1/4"" decreasing to weak surface blow
Final blow - No blow
Bottom Hole Temperature: 120 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
10 of Total Fluid
10 of Fluid in Drill Collars
10 of Drilling mud
View Pressures No Recovery Gas data.