|
API: 15-193-20666
Operator: NOR-WEST KANSAS OIL, LLC. Field: Albear Lease: J. AND B INC. Well 1 |
Location: T6S R33W, Sec. 2, SE SW SE
330 North, 1770 West, from SE corner Longitude: -100.9667361 Latitude: 39.5547133 County: Thomas Status: D&A |
Spud Date: 12/16/1997
Completion Date: 12/30/1997 Plugging Date: 12/30/1997 Total Depth: 4635 Form. at depth: MISSISSIPPIAN Elevation: 3116 KB |
| Test Number: | Data Source: TRILOBITE |
|
Interval: to
Formation tested: | Date, Time: 12/26/1997; 20:13:48 |
|
Tool Data Hole Size: in. Drill Collar ID: in. Drill Pipe ID: in. Drill Collar Length: ft. Drill Pipe Length: ft. |
|
|
Bottom Hole Temperature: DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 4140 to 4180
Formation tested: J"" LKC | Date, Time: 12/27/1997; 19:14:44 |
|
Initial Hydro Pressure: 2077 PSI
First Initial Flow Pressure: 17 PSI First Final Flow Pressure: 140 PSI Initial Shut-in Pressure: 285 PSI Second Initial Flow Pressure: 145 PSI Second Final Flow Pressure: 210 PSI Final Shut-in Pressure: 284 PSI Final Hydro Pressure: 2062 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 534 ft. Drill Pipe Length: 3608 ft. |
|
Initial blow - Strong bottom of bucket in 26 min Final blow - Weak building to 4"" |
|
|
Bottom Hole Temperature: 125 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 430 of Total Fluid 430 of Fluid in Drill Collars 10 of Clean oil 100% oil 300 of Slightly oil cut mud 5%oil 95%mud 120 of Slightly oil cut muddy water 26000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 4416 to 4472
Formation tested: Cherokee | Date, Time: 12/29/1997; 06:32:26 |
|
Initial Hydro Pressure: 2272 PSI
First Initial Flow Pressure: 22 PSI First Final Flow Pressure: 22 PSI Initial Shut-in Pressure: 334 PSI Second Initial Flow Pressure: 18 PSI Second Final Flow Pressure: 21 PSI Final Shut-in Pressure: 100 PSI Final Hydro Pressure: 2242 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 534 ft. Drill Pipe Length: 3886 ft. |
|
Initial blow - Weak 1/4"" decreasing to weak surface blow Final blow - No blow |
|
|
Bottom Hole Temperature: 120 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 10 of Total Fluid 10 of Fluid in Drill Collars 10 of Drilling mud | |
| View Pressures | No Recovery Gas data. |