Drill Stem Tests Database
Specific Well--15-195-22170
API: 15-195-22170
Operator: Castle Resources, Inc.
Field: Locker North
Lease: Bongartz
Well 2
Location: T13S R21W, Sec. 32, SW SE NW
2310 South, 1650 East, from NW corner
Longitude: -99.6821396
Latitude: 38.879003
County: Trego
Status: D&A
Spud Date: 19-JAN-96
Completion Date: 26-JAN-96
Plugging Date: 26-JAN-96
Total Depth: 4135
Form. at depth: ARBUCKLE GROUP
Elevation: 2300 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4038 to 4083
Formation tested: Cherokee Sand
Date, Time: 24-JAN-96; 18:43:29
Initial Hydro Pressure: 2018 PSI
First Initial Flow Pressure: 16 PSI
First Final Flow Pressure: 43 PSI
Initial Shut-in Pressure: 136 PSI
Second Initial Flow Pressure: 42 PSI
Second Final Flow Pressure: 58 PSI
Final Shut-in Pressure: 135 PSI
Final Hydro Pressure: 1975 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 30 ft.
Drill Pipe Length: 4012 ft.
Initial Flow - .5"" blow building to 9""
Initial Shutin - Very weak surface blow
Final Flow - .125"" blow building to 6""
Final Shutin - No blow
Bottom Hole Temperature: 110 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
115 of Total Fluid
30 of Fluid in Drill Collars
85 of Fluid in Drill Pipe
150 of Gas in pipe
15 of Clean gassy oil - 10% gas, 90% oil
100 of Mud cut oil - 50% oil, 50% mud
36 of Gravity (API)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4035 to 4090
Formation tested: Cherokee Sand ""D""
Date, Time: 25-JAN-96; 12:03:41
Initial Hydro Pressure: 2018 PSI
First Initial Flow Pressure: 27 PSI
First Final Flow Pressure: 47 PSI
Initial Shut-in Pressure: 133 PSI
Second Initial Flow Pressure: 42 PSI
Second Final Flow Pressure: 53 PSI
Final Shut-in Pressure: 141 PSI
Final Hydro Pressure: 1993 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 30 ft.
Drill Pipe Length: 4012 ft.
Initial Flow - Weak .5"" blow building to 3.5""
Initial Shutin - No blow
Final Flow - .5"" blow building to 4""
Bottom Hole Temperature: 110 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
75 of Total Fluid
30 of Fluid in Drill Collars
45 of Fluid in Drill Pipe
105 of Gas in pipe
75 of Oil cut mud - 20% oil, 80% mud
36 of Gravity (API)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.