API: 15-195-22172
Operator: Hyde-Marrs/American Energies Field: Cedar Bluff East Lease: Bollig 'A' Well 1 |
Location: T14S R22W, Sec. 22, E2 SW NE
1980 South, 1650 West, from NE corner Longitude: -99.7503957 Latitude: 38.8218536 County: Trego Status: OIL-P&A |
Spud Date: 05-FEB-96
Completion Date: 16-MAR-96 Plugging Date: 01-DEC-96 Total Depth: 4200 Form. at depth: CHEROKEE GROUP Elevation: 2227 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 3985 to 4011
Formation tested: Pawnee | Date, Time: 11-FEB-96; 09:09:06 |
Initial Hydro Pressure: 2342 PSI
First Initial Flow Pressure: PSI First Final Flow Pressure: PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 1962 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 251 ft. Drill Pipe Length: 3731 ft. |
Initial Flow - Weak surface blow, died in 16 min Initial Shutin - Bled off, no blow back Final Flow - No blow Final Shutin - No blow back *Misrun, hydraulic failure |
|
Bottom Hole Temperature: DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 3985 to 4011
Formation tested: Pawnee | Date, Time: 11-FEB-96; 15:47:58 |
Initial Hydro Pressure: 1985 PSI
First Initial Flow Pressure: 309 PSI First Final Flow Pressure: 297 PSI Initial Shut-in Pressure: 1281 PSI Second Initial Flow Pressure: 321 PSI Second Final Flow Pressure: 341 PSI Final Shut-in Pressure: 889 PSI Final Hydro Pressure: 1916 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.7 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 251 ft. Drill Pipe Length: 3731 ft. |
Initial Flow - Packers held on 4th attempt; Surface blow, .75"" in bucket Initial Shutin - Bled off, no blow back Final Flow - Built to bottom of bucket in 31.5 min Final Shutin - Bled off, no blow back |
|
Bottom Hole Temperature: 120 DEG F
Percent Porosity: Samples: No Gas Recovery: Comments: | |
Recovery 510 of Total Fluid 251 of Fluid in Drill Collars 259 of Fluid in Drill Pipe 70 of Mud w/oil scum - 1% oil, 99% mud 120 of Oil & gas cut mud - 10% oil, 25% gas, 65% mud 120 of Gassy heavy oil cut mud - 180 of Slightly gassy mud & water cut oil - 20 of Slightly mud cut oily water - | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 4067 to 4095
Formation tested: Cherokee Sand | Date, Time: 12-FEB-96; 10:39:05 |
Initial Hydro Pressure: 2018 PSI
First Initial Flow Pressure: 27 PSI First Final Flow Pressure: 30 PSI Initial Shut-in Pressure: 69 PSI Second Initial Flow Pressure: 30 PSI Second Final Flow Pressure: 31 PSI Final Shut-in Pressure: 54 PSI Final Hydro Pressure: 2006 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.7 in. Drill Pipe ID: 3.82 in. Drill Collar Length: 220 ft. Drill Pipe Length: 3860 ft. |
Initial Flow - Weak surface blow, died in 26 min. Initial Shutin - No blow back Final Flow - Weak surface blow, died in 3 min Final Shutin - No blow back |
|
Bottom Hole Temperature: 118 DEG F
Percent Porosity: Samples: No Gas Recovery: Comments: | |
Recovery 10 of Total Fluid 10 of Fluid in Drill Collars 10 of Mud w/oil scum - 1% oil, 99% mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 4 | Data Source: TRILOBITE |
Interval: 4067 to 4100
Formation tested: Cherokee Sand | Date, Time: 13-FEB-96; 20:31:30 |
Initial Hydro Pressure: 1998 PSI
First Initial Flow Pressure: 42 PSI First Final Flow Pressure: 87 PSI Initial Shut-in Pressure: 1053 PSI Second Initial Flow Pressure: 96 PSI Second Final Flow Pressure: 124 PSI Final Shut-in Pressure: 1026 PSI Final Hydro Pressure: 1997 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.7 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 220 ft. Drill Pipe Length: 3860 ft. |
Initial Flow - Steady building blow, built to 6"" in bucket Initial Shutin - Bled off, no blow back Final Flow - Steady surface blow, .5"" in bucket Final Shutin - Bled off, no blow back |
|
Bottom Hole Temperature: 119 DEG F
Percent Porosity: Samples: No Gas Recovery: Comments: | |
Recovery 200 of Total Fluid 200 of Fluid in Drill Collars 200 of Oil cut mud - 30% oil, 70% mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |