Drill Stem Tests Database
Specific Well--15-195-22172
API: 15-195-22172
Operator: Hyde-Marrs/American Energies
Field: Cedar Bluff East
Lease: Bollig 'A'
Well 1
Location: T14S R22W, Sec. 22, E2 SW NE
1980 South, 1650 West, from NE corner
Longitude: -99.7503957
Latitude: 38.8218536
County: Trego
Status: OIL-P&A
Spud Date: 05-FEB-96
Completion Date: 16-MAR-96
Plugging Date: 01-DEC-96
Total Depth: 4200
Form. at depth: CHEROKEE GROUP
Elevation: 2227 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 3985 to 4011
Formation tested: Pawnee
Date, Time: 11-FEB-96; 09:09:06
Initial Hydro Pressure: 2342 PSI
First Initial Flow Pressure: PSI
First Final Flow Pressure: PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: 1962 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 251 ft.
Drill Pipe Length: 3731 ft.
Initial Flow - Weak surface blow, died in 16 min
Initial Shutin - Bled off, no blow back
Final Flow - No blow
Final Shutin - No blow back *Misrun, hydraulic failure
Bottom Hole Temperature: DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 3985 to 4011
Formation tested: Pawnee
Date, Time: 11-FEB-96; 15:47:58
Initial Hydro Pressure: 1985 PSI
First Initial Flow Pressure: 309 PSI
First Final Flow Pressure: 297 PSI
Initial Shut-in Pressure: 1281 PSI
Second Initial Flow Pressure: 321 PSI
Second Final Flow Pressure: 341 PSI
Final Shut-in Pressure: 889 PSI
Final Hydro Pressure: 1916 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.7 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 251 ft.
Drill Pipe Length: 3731 ft.
Initial Flow - Packers held on 4th attempt; Surface blow, .75"" in bucket
Initial Shutin - Bled off, no blow back
Final Flow - Built to bottom of bucket in 31.5 min
Final Shutin - Bled off, no blow back
Bottom Hole Temperature: 120 DEG F
Percent Porosity:
Samples: No
Gas Recovery:
Comments:
Recovery
510 of Total Fluid
251 of Fluid in Drill Collars
259 of Fluid in Drill Pipe
70 of Mud w/oil scum - 1% oil, 99% mud
120 of Oil & gas cut mud - 10% oil, 25% gas, 65% mud
120 of Gassy heavy oil cut mud -
180 of Slightly gassy mud & water cut oil -
20 of Slightly mud cut oily water -
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 4067 to 4095
Formation tested: Cherokee Sand
Date, Time: 12-FEB-96; 10:39:05
Initial Hydro Pressure: 2018 PSI
First Initial Flow Pressure: 27 PSI
First Final Flow Pressure: 30 PSI
Initial Shut-in Pressure: 69 PSI
Second Initial Flow Pressure: 30 PSI
Second Final Flow Pressure: 31 PSI
Final Shut-in Pressure: 54 PSI
Final Hydro Pressure: 2006 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.7 in.
Drill Pipe ID: 3.82 in.
Drill Collar Length: 220 ft.
Drill Pipe Length: 3860 ft.
Initial Flow - Weak surface blow, died in 26 min.
Initial Shutin - No blow back
Final Flow - Weak surface blow, died in 3 min
Final Shutin - No blow back
Bottom Hole Temperature: 118 DEG F
Percent Porosity:
Samples: No
Gas Recovery:
Comments:
Recovery
10 of Total Fluid
10 of Fluid in Drill Collars
10 of Mud w/oil scum - 1% oil, 99% mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 4067 to 4100
Formation tested: Cherokee Sand
Date, Time: 13-FEB-96; 20:31:30
Initial Hydro Pressure: 1998 PSI
First Initial Flow Pressure: 42 PSI
First Final Flow Pressure: 87 PSI
Initial Shut-in Pressure: 1053 PSI
Second Initial Flow Pressure: 96 PSI
Second Final Flow Pressure: 124 PSI
Final Shut-in Pressure: 1026 PSI
Final Hydro Pressure: 1997 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.7 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 220 ft.
Drill Pipe Length: 3860 ft.
Initial Flow - Steady building blow, built to 6"" in bucket
Initial Shutin - Bled off, no blow back
Final Flow - Steady surface blow, .5"" in bucket
Final Shutin - Bled off, no blow back
Bottom Hole Temperature: 119 DEG F
Percent Porosity:
Samples: No
Gas Recovery:
Comments:
Recovery
200 of Total Fluid
200 of Fluid in Drill Collars
200 of Oil cut mud - 30% oil, 70% mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.